6711 Ellsworth Ave
Dallas, TX 75214
6711 Ellsworth Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 6711 Ellsworth Ave, Dallas, TX 75214. The most recent, filed October 14, 2020, covers: “Install fence”.
Compiled from City of Dallas records · updated Oct 14, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 14, 2020
- since Oct 14, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6711 Ellsworth Ave
What is being built at 6711 Ellsworth Ave?
The latest filing (City of Dallas permit 2009301123, October 14, 2020) covers install fence.
How many permits and filings does 6711 Ellsworth Ave have?
1 filing across 1 project, from October 14, 2020 to October 14, 2020.
Is there other construction near 6711 Ellsworth Ave?
Yes. Nearby filings include 6702 Ellsworth Ave (wire and bond swimming pool, Nov 12, 2026); 6722 Ellsworth Ave (install pergola with adjustable roof, Nov 6, 2020); 6718 Anita St (install water heater, Sep 23, 2020).
How do I get alerts for new permits at 6711 Ellsworth Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 6702 Ellsworth AveNov 12, 2026Wire and bond swimming pool · 16 m away
- 6722 Ellsworth AveNov 6, 2020Install pergola with adjustable roof · 20 m away
- 6718 Anita StSep 23, 2020Install water heater · 91 m away
- 6712 Anita StNov 14, 20268 ft tall wood fence · 93 m away
- 6719 Anita StJun 30, 20258 ft wood fence · 103 m away
- 6735 Kenwood AveNov 23, 2020Install lawn sprinkler · 105 m away
- 6713 Anita StJun 13, 20258 ft wood fence · 105 m away
- 6707 Anita StJun 3, 2025Residential remodel · 107 m away
- 6711 Kenwood AveAug 20, 2025Gas repair and test · 108 m away
- 3916 Sperry StApr 28, 2026Install 30 piers · 109 m away
- 6703 Kenwood AveJun 30, 2026Nsfaa-finish-out of 424 sq ft of existing unconditioned attic on the second-floor level into conditioned living space. scope includes a new bedroom, a new full bathroom (tub, toilet, and shower), a closet, and finished storage area. work involves new interior partition framing and finishes, three new windows installed in existing exterior brick walls (including an egress casement window serving the bedroom), new electrical (lighting, outlets, switches, smoke/co alarms, and bath exhaust fan), new plumbing for the bathroom fixtures, new hvac/ductwork to condition the space, and insulation of exposed roof/wall/floor cavities. all work is within the existing building footprint; no change to the footprint or building use · 110 m away
- 6623 Ellsworth AveJul 28, 2026The existing approach will be removed and installed in the same spot but 8' wide to the left. the approach concrete will be 6" deep with 4,000 psi concrete and #4 rebar spaced 16" apart · 113 m away