City of Dallas lists 1 filing across 1 project at 7111 Twin Tree Ln, Dallas, TX 75214. The most recent, filed July 1, 2025, covers: “8 1/2' wood fence on steel posts”.
Compiled from City of Dallas records · updated Jul 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 1, 2025
- since Jul 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7111 Twin Tree Ln
What is being built at 7111 Twin Tree Ln?
The latest filing (City of Dallas permit RES-ACC-25-000258, July 1, 2025) covers 8 1/2' wood fence on steel posts.
How many permits and filings does 7111 Twin Tree Ln have?
1 filing across 1 project, from July 1, 2025 to July 1, 2025.
Is there other construction near 7111 Twin Tree Ln?
Yes. Nearby filings include 7110 Twin Tree Ln (replace existing 200 amp 120/240 volt three phase main panel in the same location. replace existing 100 amp federal pacific subpanel and relocate it to the hallway wall. install new 200 amp outdoor emergency disconnect adjacent to the meter. install whole house surge protection and a new grounding electrode system. existing branch circuits re-landed on new breakers. no change to service size or capacity, Aug 27, 2026); 7121 Twin Tree Ln (install 168 lf of 8' board on board cedar fence with all new metal posts. includes 1 pedestrian gate. also installing 14 lf of 6' black ornamental next to a 19' double swing automatic gate that is also 6' black ornamental and over the driveway, Mar 11, 2026); 7120 Twin Tree Ln (replace or modify existing hvac, Jan 7, 2021).
How do I get alerts for new permits at 7111 Twin Tree Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 7110 Twin Tree LnAug 27, 2026Replace existing 200 amp 120/240 volt three phase main panel in the same location. replace existing 100 amp federal pacific subpanel and relocate it to the hallway wall. install new 200 amp outdoor emergency disconnect adjacent to the meter. install whole house surge protection and a new grounding electrode system. existing branch circuits re-landed on new breakers. no change to service size or capacity · 13 m away
- 7121 Twin Tree LnMar 11, 2026Install 168 lf of 8' board on board cedar fence with all new metal posts. includes 1 pedestrian gate. also installing 14 lf of 6' black ornamental next to a 19' double swing automatic gate that is also 6' black ornamental and over the driveway · 16 m away
- 7120 Twin Tree LnJan 7, 2021Replace or modify existing hvac · 20 m away
- 7131 Twin Tree LnJan 20, 2021Install inground pool and spa · 31 m away
- 7131 Greentree LnMar 6, 2026Installation of a 28kw with 2-200a ats and natural gas connections · 43 m away
- 7161 Greentree LnJun 22, 2026Replace existing hvac units , install supply ducts and boots to new remodel area. install exhaust ducts to exhaust fans. install exhaust duct to dryer · 96 m away
- 7120 Greenbrook LnAug 4, 2026Replacing 3 ton gas complete system · 100 m away
- 7140 Greenbrook LnJun 26, 2026Installing p-trap on sewer for pool backwash · 115 m away
- 7141 Greenbrook LnAug 22, 2025Roof solar- 39 module 16.185kw, line side tap · 125 m away
- 7150 Greenbrook LnJun 5, 2025Complete sistem replacement hvac · 126 m away
- 7151 Greenbrook LnNov 12, 2020Install new hvac · 135 m away
- 7175 Greentree LnNov 25, 2025Hvac change out – remove and replace one full system. no new ductwork will be installed; existing ducts will be reused. installation will be in the attic · 146 m away