60-foot gas line replacement permitted at 7159 Bennington Dr
A residential plumbing permit records replacement of approximately 60 feet of gas line at 7159 Bennington Dr. The City of Dallas permit was filed on August 18, 2026.
Summarized from City of Dallas records · updated Aug 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2026
- since Aug 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7159 Bennington Dr
What is being built at 7159 Bennington Dr?
A City of Dallas residential plumbing permit records replacement of approximately 60 feet of gas line. It does not describe a new building.
Was a gas line replacement permitted at 7159 Bennington Dr?
Yes. Permit RES-PLM-26-008704, filed August 18, 2026, covers an approximately 60-foot gas line replacement.
When was the gas line work at 7159 Bennington Dr permitted?
The City of Dallas permit was filed on August 18, 2026.
How long is the gas line being replaced at 7159 Bennington Dr?
The permit description says the replacement is approximately 60 feet.
What kind of permit was filed for 7159 Bennington Dr?
The filing is a City of Dallas Residential Plumbing Permit, number RES-PLM-26-008704.
Also being built nearby
All of 75214- 7145 Bennington DrJan 13, 2021Construct new sfd · 33 m away
- 7129 Bennington DrDec 4, 2020Sewer relay · 70 m away
- 7125 Bennington DrDec 2, 2020Replace water heater & replace/test gas service · 79 m away
- 7118 Bennington DrNov 12, 20267118 bennington - demolish and haul away entire house and haul away. safely transport all of the debris tothe land?ll. shutoff and cap utilities prior to demolition · 91 m away
- 7119 Bennington DrNov 24, 2025Upgrade challenger panel to new panel, along with emergency disconnect and new meter box · 92 m away
- 7129 Haverford DrAug 25, 2026New gas service · 98 m away
- 7105 Haverford DrJun 29, 2026Ev charging port installation · 102 m away
- 7131 Rutgers DrJun 18, 2026Fixed 2,600 sq ft of roof · 103 m away
- 7125 Rutgers DrMar 3, 2026Level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u.ground through <10 feet new 3?4” emt conduit and <60 feet new 3?4” flex conduit to power the level 2 ev charger at40amp constant draw · 108 m away
- 7119 Rutgers DrAug 20, 2025Install lennox el16, 3-ton upflow gas systeminstall aprilaire 1410 filter base · 112 m away
- 7109 Bennington DrJun 15, 2026Replace 4 ton gas ac · 115 m away
- 7115 Rutgers DrJun 1, 2026Gas test/ meter release · 116 m away