724 Lipscomb Ave
Dallas, TX 75214
Foundation repairs permitted at 724 Lipscomb Ave
City of Dallas permits indicate residential foundation repairs at 724 Lipscomb Ave, including replacement of wood foundation members and installation of a concrete support with steel shims. The permits were filed on October 6 and October 28, 2025.
Summarized from City of Dallas records · updated Oct 28, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 28, 2025
- since Oct 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplacement of beam/joist/subfloor wood foundation members. installation of 1 concrete support and replace with steel shims
Replacement of beam/joist/subfloor wood foundation members. installation of 1 concrete support and replace with steel shims
City of Dallas permitResidential Foundation RepairReplacement of beam/joist/subfloor wood foundation members. installation of 1 concrete support and replace with steel shims
Replacement of beam/joist/subfloor wood foundation members. installation of 1 concrete support and replace with steel shims
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 724 Lipscomb Ave
What work is happening at 724 Lipscomb Ave?
City of Dallas permits describe residential foundation repairs, including replacement of beam, joist, and subfloor wood members and installation of a concrete support with steel shims.
When were the foundation repair permits filed?
The permits were filed on October 6 and October 28, 2025.
What are the permit numbers for 724 Lipscomb Ave?
The City of Dallas permit numbers are RES-FDN-25-000532, filed October 6, 2025, and RES-FDN-25-000625, filed October 28, 2025.
Is a new home being built at 724 Lipscomb Ave?
The listed permits are for residential foundation repair, not new-home construction.
What foundation work is described in the permits?
Both permits describe replacing wood foundation members, installing one concrete support, and replacing the supports with steel shims.
Also being built nearby
All of 75214- 712 Lipscomb AveJun 25, 2026Replace house sewer · 12 m away
- 721 Lipscomb AveNov 25, 2020Gas relay or repair with test · 13 m away
- 717 Lipscomb AveAug 25, 2025Replacing one 3 ton system · 15 m away
- 715 Lipscomb AveDec 21, 2020Gas test · 16 m away
- 702 Lipscomb AveOct 8, 202520ft trench with mainline replacement in backyard · 21 m away
- 6028 Junius StMay 14, 20253 ton residential gas unit replacement · 36 m away
- 6032 Junius StOct 16, 2020Remove & replace approach & sidewalk · 36 m away
- 6022 Junius StJul 24, 2026Reroof · 44 m away
- 6008 Junius StOct 19, 202650 gallon gas american water heater in laundry room closet · 78 m away
- 731 Nesbitt DrSep 28, 2020Replace or modify existing hvac · 94 m away
- 6000 Junius StMay 20, 2026Install 40 gallon gas water heater in attic (swap out) · 101 m away
- 716 N Glasgow DrNov 9, 2026Will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed · 106 m away