7334 Casa Loma Ave
Dallas, TX 75214
New construction phases permitted at 7334 Casa Loma Ave
City of Dallas records show new-construction permits filed at 7334 Casa Loma Ave on October 1, 2025. The permit descriptions include first-floor and second-floor work, Phase 3, and site work. The records do not identify the project’s use, size, or tenant.
Summarized from City of Dallas records · updated Oct 1, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Oct 1, 2025
- since Oct 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projects7.9.2025 - 7413 e grand ave. new construction of mfd project with 15 dwus. dp25-061. s234-182
7.9.2025 - 7413 e grand ave. new construction of mfd project with 15 dwus. dp25-061. s234-182
City of Dallas permitCommercial New Construction Permit
Sources: City of Dallas
Questions about 7334 Casa Loma Ave
What is being built at 7334 Casa Loma Ave?
Dallas permit records list new-construction work, including first-floor and second-floor phases and site work. They do not specify the building’s use.
When were permits filed for 7334 Casa Loma Ave?
The five City of Dallas permit records in the fact sheet are dated October 1, 2025.
What are the permit numbers for construction at 7334 Casa Loma Ave?
The records include permits COM-PH-NEW-25-000454 for the first floor, COM-PH-NEW-25-000455 for the second floor, COM-PH-NEW-25-000456 for Phase 3, and COM-PH-NEW-25-000457 for site work.
Is a business or tenant opening at 7334 Casa Loma Ave?
The available permit records do not name a business or tenant.
How large is the project at 7334 Casa Loma Ave?
The records do not provide a square-footage figure or project cost estimate.
Also being built nearby
All of 75214- 7330 Casa Loma AveDec 26, 20256' and 8'h wood fence with metal post. 210 · 7 m away
- 7327 Casa Loma AveOct 6, 2025Install new hvac system · 19 m away
- 7307 Casa Loma AveMay 19, 2025Install evap coil · 50 m away
- 7331 Coronado AveSep 28, 2026Install water heater · 96 m away
- 7315 Coronado AveJun 16, 2025Remove old composition shingles and install new composition shingles · 102 m away
- 7338 Coronado AveMay 6, 2026Verify utilty disconnects ( water, gas, electric)mechanically demolish te primary structure and any specified outbuildingsbreak and remove concrete slabs, footings and driveway haul all debris to a tceq-authorized landfillrough grade the lot to a walkabel conditionasbestos abatement through a third party subcontractor with texas licensegc acts only as coordinator for asbestos inspector. any liability regarding fibres, air quality, or disposal remains with the licensed abatement contractorper dallad city code article x, gc will install orange fencing around protected trees. stormborn construction is responsible for identifying all "heritage" or "protected" trees on the survey. gc is not responsible for the removal of undisclosed deptic tanks, swimming pools, or underground storage tanks unless specifically listed in scope of worksidewalk/curbs gc will use "tracking pads" to protect city property, but is not liable for existing cracks or failures in aged city infrastructuregc will maintain a safe job site are per osha standardsgc is liable only for damage to property owners assets caused by gross negligence. gc is not liable for "vibration damage " to neighbors structures if work is performed within standard industry limits · 109 m away
- 7314 Coronado AveDec 5, 2025-- repairs needed: -- 25 foot tunnel -- 1 dirt access need to pull back turf to make access -- there are 2 breaks where we need to tunnel from under the window 21 feet straight-- when you locate the first break the second one is 3 feet from there · 114 m away
- 7306 Coronado AveNov 6, 2026Install new rheem direct vent 40 gallon gas water heater with new direct venting system · 119 m away
- 7302 Coronado AveJun 24, 2026Gas line install to pool heater · 122 m away
- 7530 East Grand AveNov 17, 2025Plumbing work · 151 m away
- 7532 East Grand AveNov 19, 2025Demolition as shown on plans. provide and install 2 new trane rtu's, curbs and accessories per plans. provide and install new ductwork, grills, low voltage wiring, thermostats/sensors and drains. install customer provided make up air unit. full captive air package to be provided by customer and installed by others. includes crane and permitting. any final drain termination connections to be completed by plumber. all line volteage to be completed by electrician.all work to be completed according to plans and within state and local codes · 152 m away
- 7532 E. Grand Ave · Mcref IV Trailhead Apartment Owner LPSep 19, 2025Beans and brews — new construction — 1,100 sqf · 152 m away