1300 Corinth St
Dallas, TX 75215
Interior remodel to create Suite 100
A commercial interior remodel to create Suite 100 was permitted at 1300 Corinth St on December 3, 2025. The City of Dallas permit record does not list a project size or valuation.
Summarized from City of Dallas records · updated Dec 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 3, 2025
- since Dec 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1300 Corinth St
What is being built at 1300 Corinth St?
A City of Dallas permit describes an interior remodel to create Suite 100. The permit, COM-ALT-ADD-25-001141, was filed on December 3, 2025.
When was the remodel at 1300 Corinth St permitted?
The permit was filed on December 3, 2025. The record does not list a construction schedule.
What is the permit number for 1300 Corinth St?
The City of Dallas permit number is COM-ALT-ADD-25-001141. It is listed as a Commercial Alteration Addition Permit.
How large is the Suite 100 remodel at 1300 Corinth St?
The permit record does not provide a square-footage figure.
How much will the work at 1300 Corinth St cost?
The permit record does not list a valuation or estimated project cost.
Also being built nearby
All of 75215- 1405 Seegar StJun 12, 2025(7) four story townhomes. site development including driveway, sidewalks, site utilities, landscaping, access to adjoining streets. building construction including wood constructions with concrete foundations and slab. stairs, windows, doors, exterior finishes. three bedroom units with roof deck · 155 m away
- 1919 S Akard StOct 28, 2020Install car charging station · 159 m away
- 2022 Botham Jean BlvdOct 7, 2026Temporary gas release · 175 m away
- 1105 Parker StMay 21, 2026No work. re release to power company for disconnected meter esi 10443720003850165 · 188 m away
- 1110 Parker StMay 21, 2026No work performed. need meter inspection for a reconnect for esid 10443720007495293 · 196 m away
- 1910 Wall St · Upperroom OfficesOct 3, 2025Upperroom phase 02 tennant finish out — renovation/alteration — a tenant finishes the interior renovation of an existing warehouse for offices for the church staff · 202 m away
- 1524 Corinth StSep 28, 2020Upgrade existing electrical service · 211 m away
- 1508 Seegar StSep 28, 2026Address shows to be 1512 seegar but in dallas permit system they told me i had to do 1508 running new gas line from meter to home. unit 104 · 227 m away
- 2116 Cockrell AveMay 22, 2025200 amp overhead temporary power pole for jobsite use · 229 m away
- 2021 Cockrell AveJan 6, 2026We are installing a sliding gate. the gate will be ~13ft wide and ~8ft 3in tall. the sliding gate will have a liftmaster csl24ul motor powered with a solar kit that comes with the motor. the motor is powered by a solar panel, no direct power. posts: 4x4 metal posts that will be 4 ft deep pickets will be cedar. style: horizontal board on board · 251 m away
- 1800 S Akard StNov 18, 2026Replace 1/2" rpz · 265 m away
- 1315 Beaumont StAug 18, 2026Replace burned meter base · 283 m away