1723 Pine St
Dallas, TX 75215
1723 Pine St: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 1723 Pine St, Dallas, TX 75215. The most recent, filed August 11, 2025, covers: “Repair meter base”.
Compiled from City of Dallas records · updated Aug 11, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 11, 2025
- since Aug 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 1723 Pine St
What is being built at 1723 Pine St?
The latest filing (City of Dallas permit RES-ELC-25-002130, August 11, 2025) covers repair meter base.
How many permits and filings does 1723 Pine St have?
2 filings across 2 projects, from August 11, 2025 to August 11, 2025.
Is there other construction near 1723 Pine St?
Yes. Nearby filings include 4224 Colonial Ave (hvac installation, Jul 28, 2026); 4122 Colonial Ave (service repair, Feb 11, 2026); 1724 Poplar St (bu zo rehab multifamily residential property including small addition, Jul 9, 2026).
How do I get alerts for new permits at 1723 Pine St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 4224 Colonial AveJul 28, 2026Hvac installation · 86 m away
- 4122 Colonial AveFeb 11, 2026Service repair · 99 m away
- 1724 Poplar StJul 9, 2026Bu zo rehab multifamily residential property including small addition · 101 m away
- 1717 Poplar StMay 14, 2025New build associated with permit #2503181084 · 116 m away
- 1727 Pear StMay 9, 2025Install drive approach and city walk · 119 m away
- 1717 Pear StOct 16, 2026New build · 126 m away
- 4314 Colonial AveDec 23, 2020Replace panel · 165 m away
- 4322 Colonial AveFeb 17, 2026Service upgrade · 171 m away
- 2232 Poplar StAug 24, 2026Plumbing work · 214 m away
- 1643 Pine StJul 8, 2026Installing an electric tank water heater · 218 m away
- 1634 Pine StJun 11, 2025Service repair/ just replace riser due storm damaged · 222 m away
- 2237 Poplar StOct 15, 2025Hvac changeout – replace 1 full horizontal gas/electric system controlling the main portion of the home. system is located in the attic and accessed via drop-down staircase in the hallway. new plywood will be laid down for unit support. replace primary drain pvc to point of termination and add a jones valve. gas line to be fitted with a drip leg · 222 m away