2242 Pine St
Dallas, TX 75215
Sewer branch line repair at 2242 Pine St
Dallas permits indicate work to expose and replace a degraded sewer branch line at 2242 Pine St, including a 15-foot tunnel and access hole. The two residential plumbing permits were filed January 12 and January 20, 2026.
Summarized from City of Dallas records · updated Jan 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 20, 2026
- since Jan 12, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2242 Pine St
What work is permitted at 2242 Pine St in Dallas?
City of Dallas records show two residential plumbing permits for tunneling to expose a pipe break and replace a degraded sewer branch line. The permits were filed January 12 and January 20, 2026.
Is a new home being built at 2242 Pine St?
The records provided show plumbing work, not a new-home construction permit. One permit describes tunneling to expose a break in a cast-iron pipe.
What is permit RES-PLM-26-000728 for?
Filed January 20, 2026, the permit describes an additional 15-foot tunnel and access hole to replace a degraded sewer branch line.
What is permit RES-PLM-26-000396 for?
Filed January 12, 2026, the permit describes a 15-foot tunnel to expose a break in a cast-iron pipe.
When were permits filed for 2242 Pine St?
The City of Dallas records list filings on January 12 and January 20, 2026, for residential plumbing work.
Also being built nearby
All of 75215- 2228 Pine StJan 6, 2026Gas test only · 35 m away
- 2321 Greer StJan 30, 2026Re roof with 30 year composition shingles class 3 approx 830 sq ft · 91 m away
- 2317 Greer StNov 12, 2020Construct new sfd · 92 m away
- 2318 Poplar StJun 16, 2025Hvac replacement · 112 m away
- 2332 Poplar StJan 7, 2026Gas test /upgrade code · 122 m away
- 2232 Poplar StAug 24, 2026Plumbing work · 130 m away
- 2237 Poplar StOct 15, 2025Hvac changeout – replace 1 full horizontal gas/electric system controlling the main portion of the home. system is located in the attic and accessed via drop-down staircase in the hallway. new plywood will be laid down for unit support. replace primary drain pvc to point of termination and add a jones valve. gas line to be fitted with a drip leg · 137 m away
- 2417 Felton CtMay 20, 2025Electrical for new construction · 170 m away
- 2425 Pine StApr 9, 2026Mechanically demolish, remove, and dispose of portable building · 185 m away
- 2329 Stoneman StOct 16, 2026Gas ran from meter to stove location · 192 m away
- 2303 Stoneman StAug 19, 2026Gas test · 195 m away
- 2312 Stoneman StJan 6, 2026New hvac system · 206 m away