A 1,200-square-foot storage extension permitted in Dallas
City of Dallas permits describe a 1,200-square-foot storage extension with a ramp at 2320 Martin Luther King Jr Blvd. The addition permit was filed October 20, 2025, and a separate electrical permit was filed October 23, 2025.
Summarized from City of Dallas records · updated Oct 23, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Oct 23, 2025
- since Oct 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsZo bc extension to the back of the building for storage 1200 sft w ramp. electrical lights (adding 12 strip lights) , adding 3 wall units no ducts. no plumbing work to be done
Zo bc extension to the back of the building for storage 1200 sft w ramp. electrical lights (adding 12 strip lights) , adding 3 wall units no ducts. no plumbing work to be done
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2320 Martin Luther King Jr Blvd
What is being built at 2320 Martin Luther King Jr Blvd?
A City of Dallas permit describes a 1,200-square-foot extension to the back of the building for storage, with a ramp. It also lists lighting and three wall units, with no plumbing work.
When was the storage extension permitted?
The commercial alteration and addition permit, COM-ALT-ADD-25-001064, was filed October 20, 2025. A related electrical permit, COM-ELC-25-002814, was filed October 23, 2025.
Is a new building being built at this address?
The permit describes an extension to the back of an existing building for storage. It does not describe a separate new building.
What electrical work is planned at 2320 Martin Luther King Jr Blvd?
The permits list light fixtures and outlets using the existing electrical service, panels or circuits. The addition permit also describes 12 strip lights and three wall units.
What's being built near Starbucks Coffee on Martin Luther King Jr Blvd?
At 2320 Martin Luther King Jr Blvd, about 215 meters from the listed Starbucks at 1920 Martin Luther King Jr Blvd, permits describe a 1,200-square-foot storage extension with a ramp.
Also being built nearby
All of 75215- 2317 Peabody AveDec 17, 2025Gas pressure check · 116 m away
- 2313 Peabody AveMay 1, 2026Install double check backflow device and 3 yard hydrants for garden watering · 116 m away
- 2320 South BlvdApr 10, 2026Run gas lines to pool heater and grill · 120 m away
- 2434 Martin Luther King Jr BlvdDec 9, 2025Gas test · 134 m away
- 2401 Peabody AveSep 24, 2025Cut and remove old approach to create new 21' approach for new build. sidewalk will be left intact · 140 m away
- 2403 Peabody AveOct 30, 2025New hvac unit ,ducts, new condesners ,evreything new · 141 m away
- 2405 Peabody AveOct 3, 2025Install 70ft of gas pipe · 143 m away
- 2402 Peabody AveJul 16, 2026Lift with pressure piers (installing pressure piers) · 152 m away
- 1904 Martin Luther King Jr BlvdOct 6, 2026This permit application is for the temporary installation of a stage, performance risers, and aluminum truss structures associated with the forest theater grand return special event.a temporary stage measuring 60 feet wide by 48 feet deep by 4 feet high will be installed within the roadway at the intersection of martin luther king jr. boulevard and s.m. wright freeway, as shown on the approved event site plan. the stage will include three (3) sets of 4-foot access stairs to provide performer access.the following performance risers will be installed on the stage:one (1) circular riser measuring 12 feet in diameter by 3 feet hightwo (2) risers measuring 12 feet x 8 feet x 2 feet highone (1) riser measuring 12 feet x 8 feet x 3 feet highone (1) riser measuring 12 feet x 8 feet x 1 foot hightwo (2) risers measuring 8 feet x 8 feet x 1 foot hightemporary aluminum truss structures will be installed over the northeast crosswalk areas at the intersection of martin luther king jr. boulevard and s.m. wright freeway. each truss structure will measure approximately 40 feet wide by 20 feet high and will be constructed from multiple interconnected 20-foot aluminum truss sections. the truss structures will span the crosswalk areas and support temporary lighting, audio, drapery, and other event production equipment associated with the special event.all truss structures, suspended equipment, stage components, and associated temporary structures will be installed, secured, and maintained in accordance with the manufacturer's specifications and any required engineering documentation. installation and removal will be performed by qualified event production personnel, and all temporary structures will remain within the approved special event permit footprint · 157 m away
- 2430 Peabody AveNov 11, 2020Upgrade existing electrical service · 177 m away
- 2409 South BlvdOct 20, 2026Installation of:15 concrete piers33 pad and blocks300 ft of treated beam700 square ft of crawl spacethis is to provide stabilization · 178 m away