2624 Donald St
Dallas, TX 75215
2624 Donald St: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 2624 Donald St, Dallas, TX 75215 since July 14, 2025. The most recent, filed July 23, 2025, covers: “Replacing existing 2.5 ton heat pump and airhandler”.
Compiled from City of Dallas records · updated Jul 23, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 23, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2624 Donald St
What is being built at 2624 Donald St?
The latest filing (City of Dallas permit RES-MEC-25-001456, July 23, 2025) covers replacing existing 2.5 ton heat pump and airhandler.
How many permits and filings does 2624 Donald St have?
2 filings across 2 projects, from July 14, 2025 to July 23, 2025.
What is being built near Citybuild Community Development Corporation in Dallas?
2624 Donald St is about 41 m from Citybuild Community Development Corporation (6907 Bexar St). Its latest filing is for replacing existing 2.5 ton heat pump and airhandler.
Is there other construction near 2624 Donald St?
Yes. Nearby filings include 6907 Bexar St (resource center — new construction — 2400 sq ft commercial building, Apr 9, 2024); 6911 Bexar St (remove the existing lighting fixtures in the serving area and replace them with new fixtures. relocate existing electrical receptacles as necessary to accommodate the bar and countertop area, Nov 18, 2026); 6915 Bexar St (schedule mechanical roof inspection for bonton farms, Feb 3, 2026).
How do I get alerts for new permits at 2624 Donald St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 6907 Bexar St · Citybuild Community Development CorporationApr 9, 2024Resource center — new construction — 2400 sq ft commercial building · 41 m away
- 6911 Bexar StNov 18, 2026Remove the existing lighting fixtures in the serving area and replace them with new fixtures. relocate existing electrical receptacles as necessary to accommodate the bar and countertop area · 42 m away
- 6915 Bexar StFeb 3, 2026Schedule mechanical roof inspection for bonton farms · 42 m away
- 6804 Bexar StDec 10, 2020Gas relay or repair with test · 71 m away
- 2711 Donald StApr 29, 2026No water access per dwu (contact brandie) · 100 m away
- 2712 Rogers RdJan 21, 2021Repair fire damage on all plumbing · 126 m away
- 2732 Choice StJan 13, 2021Upgrade 125 amp meterbase · 191 m away
- 2707 Parsons StMar 24, 2026Solicito autorización para construir una fence de 8 pies de altura en mi propiedad, los materiales serán de madera y postes de metal · 244 m away
- 2724 Keeler StAug 12, 2025Nsfaa- new residential single family home construction · 304 m away
- 2710 Municipal StAug 27, 2026Replace 1 - 1/2 rpz located in the fuel island car wash · 362 m away
- 2900 Municipal Street · City Of DallasJan 26, 2024Dwu material storage warehouse — renovation/alteration — interior renovation of existing men's and women's restroom · 516 m away
- 2900 Municipal StDec 30, 2025Renovation of existing men and women restroom · 516 m away