2700 Al Lipscomb Way
Dallas, TX 75215
Existing commercial space undergoing 2,615-square-foot rehabilitation
Permits filed June 5 and August 7, 2025, indicate rehabilitation of a 2,615-square-foot commercial space at 2700 Al Lipscomb Way, with walls rebuilt and new electrical work while existing plumbing is used. A September 3 permit describes electrical work for a first-floor recreational area for tenants in a multifamily building; a September 25 plumbing permit covers washing-machine connections and two existing bathrooms.
Summarized from City of Dallas records · updated Sep 25, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Sep 25, 2025
- since Jun 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsRemodel existing space on the first floor of a multi-family unit. the space will be a recreational area for tenants. install lights, receptacles and 100 a panel. meters existing
Remodel existing space on the first floor of a multi-family unit. the space will be a recreational area for tenants. install lights, receptacles and 100 a panel. meters existing
City of Dallas permitCommercial Electrical PermitRehabilitation of an existing commercial space without a change of use. demolition occurred due to abatement requirement. walls in place and open on one side. we are wanting to build back walls and utilize existing plumbing. new electrical will be installed for required outlets, switches, and lighting throughout the 2615 square foot area
Rehabilitation of an existing commercial space without a change of use. demolition occurred due to abatement requirement. walls in place and open on one side. we are wanting to build back walls and utilize existing plumbing. new electrical will be installed for required outlets, switches, and lighting throughout the 2615 square foot area
City of Dallas permitCommercial Alteration Addition PermitRehabilitation of an existing commercial space without a change of use. demolition occurred due to abatement requirements. we are wanting to build back walls and utilize existing plumbing. new electrical will be installed for required outlets, switches, and lighting throughout the 2615 square foot area
Rehabilitation of an existing commercial space without a change of use. demolition occurred due to abatement requirements. we are wanting to build back walls and utilize existing plumbing. new electrical will be installed for required outlets, switches, and lighting throughout the 2615 square foot area
City of Dallas permitCommercial New Construction Permit
Sources: City of Dallas
Questions about 2700 Al Lipscomb Way
What is being built at 2700 Al Lipscomb Way?
City of Dallas permits describe rehabilitation of an existing 2,615-square-foot commercial space, including rebuilding walls and installing electrical outlets, switches and lighting. A separate electrical permit describes a first-floor recreational area for tenants in a multifamily building.
When was work permitted at 2700 Al Lipscomb Way?
The first listed permit was filed June 5, 2025, followed by filings on August 7, September 3 and September 25, 2025.
Is a new building being constructed at 2700 Al Lipscomb Way?
The June 5 permit is classified as a Commercial New Construction Permit, but its description says the work is rehabilitation of an existing commercial space without a change of use.
What is the 2,615-square-foot project at 2700 Al Lipscomb Way?
The June 5 and August 7, 2025 permits describe rehabilitation of an existing 2,615-square-foot commercial space. The work includes rebuilding walls and adding electrical fixtures and wiring, while using existing plumbing.
Is there a recreational area planned at 2700 Al Lipscomb Way?
A September 3, 2025 electrical permit describes remodeling an existing first-floor space in a multifamily building for tenant recreation. It includes lighting, receptacles and a 100-amp panel.
What's being permitted near Dallas ISD's Adelio Williams Career Institute?
At 2700 Al Lipscomb Way, about 166 meters from the institute, City of Dallas permits describe rehabilitation of an existing commercial space and work on a first-floor tenant recreational area. The listed filings were dated June 5 through September 25, 2025.
Also being built nearby
All of 75215- 2715 Park Row AveDec 9, 2025Gas test · 97 m away
- 2706 Park Row AveFeb 13, 2026Water heater traditional change-out · 111 m away
- 2734 Park Row AveSep 29, 2026New construction · 113 m away
- 2801 Park Row AveNov 17, 2026Site work · 166 m away
- 2626 Park Row AveJul 23, 2025Foundation repair per attached initial engineering report · 173 m away
- 2618 Park Row AveOct 28, 2020Interior exterior remodel to sfd. no foundation work per applicant · 183 m away
- 2614 Park Row AveJan 27, 2026Foundation repair-shim 1766sqft and replace 68' of wood · 188 m away
- 2607 Park Row AveNov 23, 2020Upgrade existing electrical service · 191 m away
- 2824 Park Row AveAug 24, 20264-ton heat pump condenser with 88k air handler changeout · 202 m away
- 2530 S Malcolm X BlvdOct 21, 2025Repair gas leak · 238 m away
- 2835 Al Lipscomb WayDec 16, 2025This is a clean and show, electrical no-work permit application. the space has recently been vacated by the tenant, and we need to have power restored to show the space to prospective tenants · 259 m away
- 2635 South BlvdFeb 13, 2026Gas pressure test · 273 m away
More apartments & multifamily in 75215, demolitions in 75215.