2906 Pine St
Dallas, TX 75215
2906 Pine St: 1 project on record
City of Dallas lists 1 filing across 1 project at 2906 Pine St, Dallas, TX 75215. The most recent, filed October 14, 2025, covers: “Putting up 8ft wooded fence”.
Compiled from City of Dallas records · updated Oct 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 14, 2025
- since Oct 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2906 Pine St
What is being built at 2906 Pine St?
The latest filing (City of Dallas permit RES-ACC-25-000339, October 14, 2025) covers putting up 8ft wooded fence.
How many permits and filings does 2906 Pine St have?
1 filing across 1 project, from October 14, 2025 to October 14, 2025.
Is there other construction near 2906 Pine St?
Yes. Nearby filings include 2927 Pine St (gas relay or repair with test, Dec 4, 2020); 2903 Reed Ln (replace vented wall furnace, Aug 28, 2026); 2911 Reed Ln (electrical remodel, Aug 7, 2025).
How do I get alerts for new permits at 2906 Pine St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 2927 Pine StDec 4, 2020Gas relay or repair with test · 28 m away
- 2903 Reed LnAug 28, 2026Replace vented wall furnace · 69 m away
- 2911 Reed LnAug 7, 2025Electrical remodel · 69 m away
- 2923 Reed LnMay 21, 2025Nsfaa-new residential construction · 72 m away
- 2834 Pine StAug 18, 2026Gas line repair · 90 m away
- 2806 Pine StMar 4, 2026Has test · 122 m away
- 2818 Reed LnJun 22, 2026Nsfaa-single family dwelling 2 story · 126 m away
- 2800 Pine StJul 17, 2025Panel upgrade · 129 m away
- 2938 Reed LnDec 10, 2020Gas relay or repair with test · 153 m away
- 4215 S Malcolm X BlvdOct 26, 2026Repair existing fire-damaged commercial building at 4215 s. malcolm x blvd. scope includes removal and replacement of fire-damaged wood framing, including damaged wall studs, roof framing members, roof decking/sheathing, and related structural wood components as required. replace damaged roofing materials and restore the roof assembly. remove and replace damaged electrical wiring, devices, panels/components, and fixtures as required, and bring affected electrical work into current code compliance. repair interior and exterior finishes disturbed by the fire-damage repairs. no increase in building footprint is proposed · 154 m away
- 4302 S Malcolm X BlvdSep 24, 2025Installation of new concrete approach · 156 m away
- 3027 Pine StJul 1, 2025Replace the feeder wires in the overhead riser, meter base, and electrical panel with the correct size.install a whole home surge protector.separate the double lugged neutralsinstall a cable protector over the cables entering the back side of the panel.install two new ground rods · 163 m away