3033 Dorris St
Dallas, TX 75215
New residential construction permitted at 3033 Dorris St
A City of Dallas permit filed Aug. 14, 2026, describes new residential construction at 3033 Dorris St. Related plumbing, electrical and HVAC permits were filed through Sept. 13, 2026.
Summarized from City of Dallas records · updated Sep 13, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Sep 13, 2026
- since Aug 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 3033 Dorris St
What is being built at 3033 Dorris St in Dallas?
A City of Dallas permit describes new residential construction at the address. The permit, RES-NEW-26-001230, was filed Aug. 14, 2026.
When was construction permitted at 3033 Dorris St?
The new-construction permit was filed Aug. 14, 2026. Related permits were filed Aug. 17, Aug. 24 and Sept. 13.
Are there plumbing and electrical permits for 3033 Dorris St?
Yes. A plumbing permit was filed Aug. 17, 2026, and an electrical permit was filed Aug. 24, 2026, for the new construction.
Is there an HVAC permit for 3033 Dorris St?
Yes. The City of Dallas filed residential mechanical permit RES-MEC-26-005048 for a new HVAC system on Sept. 13, 2026.
How much will the new construction at 3033 Dorris St cost?
The available permit records do not report a project cost.
Is 3033 Dorris St a residential or commercial project?
The available permits describe residential new construction and related residential mechanical, electrical and plumbing work.
Also being built nearby
All of 75215- 3012 Dorris StJun 29, 2026Replacing 50 gallon electric water heater · 37 m away
- 3007 Dorris StOct 30, 20264-ton condenser with 88k btus furnace changeout · 45 m away
- 3031 Valentine StDec 29, 2025Install 2- electric hvac system ~ 1-4 ton & 1-2 ton, exhaust fan, dryer, vent-a-hood · 100 m away
- 3037 Valentine StDec 23, 2020Demolition sfd · 105 m away
- 3041 Valentine StOct 21, 2025New hvac · 110 m away
- 2914 Dorris StOct 13, 2026Nsfaa new construction · 167 m away
- 2903 Valentine StDec 4, 2020Construct new sfd · 205 m away
- 2927 Silkwood StNov 6, 2026Nsfaa new construction · 242 m away
- 2901 Silkwood StSep 10, 2026Gas test and release · 263 m away
- 2818 Valentine StNov 17, 2026Replacing the gas water heater · 263 m away
- 2825 Dorris StJul 7, 2026Plumbing final · 271 m away
- 2811 Dorris StAug 25, 2025New hvac and ductwork · 287 m away