1558 Vermont Ave
Dallas, TX 75216
1558 Vermont Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 1558 Vermont Ave, Dallas, TX 75216. The most recent, filed January 7, 2021, covers: “Interior remodel”.
Compiled from City of Dallas records · updated Jan 7, 2021
- Projects
- 2
- 2 filings
- Latest filing
- Jan 7, 2021
- since Jan 7, 2021
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 1558 Vermont Ave
What is being built at 1558 Vermont Ave?
The latest filing (City of Dallas permit 2101061102, January 7, 2021) covers interior remodel.
How many permits and filings does 1558 Vermont Ave have?
2 filings across 2 projects, from January 7, 2021 to January 7, 2021.
Is there other construction near 1558 Vermont Ave?
Yes. Nearby filings include 1531 Iowa Ave (new hvac installation for a remodel and addition, Mar 28, 2026); 1518 Vermont Ave (re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well, Oct 21, 2026); 1544 Iowa Ave (repair to the service riser, due to the recent storm over the weekend. no alterations to the electrical service, Oct 7, 2026).
How do I get alerts for new permits at 1558 Vermont Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75216- 1531 Iowa AveMar 28, 2026New hvac installation for a remodel and addition · 118 m away
- 1518 Vermont AveOct 21, 2026Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 123 m away
- 1544 Iowa AveOct 7, 2026Repair to the service riser, due to the recent storm over the weekend. no alterations to the electrical service · 133 m away
- 1534 Iowa AveMay 29, 2026Full sewer repipe under pier and beam & replace cleanouts · 148 m away
- 1630 Danube DrSep 4, 2026Replace 5 ton complete gas system · 160 m away
- 1511 Iowa AveOct 8, 2026Install electrical for new construction · 172 m away
- 1442 Stella AveMar 1, 2026New house · 221 m away
- 1439 Stella AveMar 13, 2026Replace 3.5 ton hvac complete · 234 m away
- 1560 Danube DrAug 26, 2025Gas repair with test · 234 m away
- 1815 Danube DrDec 15, 2025Gas test · 239 m away
- 1622 Georgia AveOct 5, 2026Service repair · 239 m away
- 1660 Corinth StNov 10, 2025We will replace the main sewer lines throughout the building with pvc up to the garage. the garage and main line that runs to the street will be chain snaked and jetted since the line looks to be in good condition. the restrooms/kitchen in the main living quarters will have the sanitary line replaced due to back fall and a large belly in the line. there will be 4 accesses and approximately 370ft of tunnel under the building · 265 m away