2445 E Ledbetter Dr
Dallas, TX 75216
Permit filed for Todd Middle School locker room addition
A City of Dallas permit filed March 27, 2026, describes an addition of locker rooms next to the baseball field at Todd Middle School at 2445 E Ledbetter Dr. Earlier permits filed in December 2025 cover plumbing work, electrical apparatus, and school HVAC work.
Summarized from City of Dallas records · updated Mar 27, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Mar 27, 2026
- since Dec 1, 2020
- Largest scope
- —
- Listed value
- $226K
- partial · often understated
Permit & project history
6 projectsWork includes installing and modifying ductwork throughout the school, replacing damaged sections, sealing all connections, and ensuring proper airflow. additional tasks include inspecting hvac units, checking controls, and confirming the system operates safely and efficiently
Work includes installing and modifying ductwork throughout the school, replacing damaged sections, sealing all connections, and ensuring proper airflow. additional tasks include inspecting hvac units, checking controls, and confirming the system operates safely and efficiently
City of Dallas permitCommercial Mechanical Permit
Sources: City of Dallas
Questions about 2445 E Ledbetter Dr
What is being built at 2445 E Ledbetter Dr?
A City of Dallas permit describes a locker room addition next to the baseball field at Todd Middle School. The permit, COM-ALT-ADD-26-000717, was filed March 27, 2026.
Is Todd Middle School getting new locker rooms?
A March 27, 2026, City of Dallas permit describes an addition of locker rooms next to the school's baseball field. The record does not provide the addition's size or cost.
When was the locker room addition permitted?
The City of Dallas permit for the locker room addition was filed March 27, 2026. Its permit number is COM-ALT-ADD-26-000717.
What other work is permitted at 2445 E Ledbetter Dr?
December 2025 permits cover plumbing for a restroom, electrical apparatus, and HVAC ductwork and inspections at the school. The plumbing permit describes one sink, one toilet, and one floor drain.
Is a new school being built at 2445 E Ledbetter Dr?
The records describe work at an existing school, including a locker room addition and mechanical, plumbing, and electrical work. They do not describe construction of a new school.
Also being built nearby
All of 75216- 2445 East Ledbetter Drive · Dallas ISDJan 29, 2025Disd - dr. frederick douglass todd sr. middle school administrative offices renovation — renovation/alteration — to design and remodel the interior for administrative offices for the dr. frederick douglass todd ms
- 4927 Veterans DrMar 2, 2026Nsfaa 12x20x10 ft 6 inch shed no electric no plumbing no green · 133 m away
- 2414 Kristen DrOct 19, 2026Sewer line replace · 212 m away
- 2425 Kristen DrSep 10, 2025Home owner had gas test done to get gas reinstated · 223 m away
- 2443 Kristen DrOct 25, 2026New home service · 223 m away
- 2419 Kristen DrJan 7, 2021Permanent electrical service · 224 m away
- 4888 Veterans DrJul 17, 2026Traffic signal installation · 239 m away
- 2422 E Ledbetter DrApr 23, 2026Nsfaa new construction of a detached 750 sq ft 2 car garage and office studio 25x30 · 240 m away
- 2414 E Ledbetter DrSep 21, 2020Remodel existing plumbing · 257 m away
- 5041 Veterans DrJun 17, 2025Change fence · 316 m away
- 4800 Veterans DrJul 14, 2025Demolish all structures on property · 319 m away
- 2711 E Ledbetter DrAug 11, 2026Gas pressure test, installed new gas valves on water heater, furnace, and stove · 321 m away