groundranger
Recent · latest filing Mar 2026Commercial

2445 E Ledbetter Dr

Dallas, TX 75216

Permit filed for Todd Middle School locker room addition

A City of Dallas permit filed March 27, 2026, describes an addition of locker rooms next to the baseball field at Todd Middle School at 2445 E Ledbetter Dr. Earlier permits filed in December 2025 cover plumbing work, electrical apparatus, and school HVAC work.

Summarized from City of Dallas records · updated Mar 27, 2026

Projects
6
6 filings
Latest filing
Mar 27, 2026
since Dec 1, 2020
Largest scope
—
Listed value
$226K
partial · often understated

Permit & project history

6 projects
  1. Dsst-disd todd ms - locker rooms addition next to the baseball field

    Dsst-disd todd ms - locker rooms addition next to the baseball field

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000717
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Add new plumbing to restroom, 1 sink and 1 toilet and 1 floor drain

    Add new plumbing to restroom, 1 sink and 1 toilet and 1 floor drain

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-003341
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Work includes installing and modifying ductwork throughout the school, replacing damaged sections, sealing all connections, and ensuring proper airflow. additional tasks include inspecting hvac units, checking controls, and confirming the system operates safely and efficiently

    Work includes installing and modifying ductwork throughout the school, replacing damaged sections, sealing all connections, and ensuring proper airflow. additional tasks include inspecting hvac units, checking controls, and confirming the system operates safely and efficiently

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-001344
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Install electrical apparatus according to print

    Install electrical apparatus according to print

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003578
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Remove existing roof and install new roof

    Remove existing roof and install new roof

    City of Dallas permitBuilding (BU) Commercial Alteration$226K
    Record
    2011231069
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Remove existing roof and install new roof

    Remove existing roof and install new roof

    City of Dallas permitBuilding (BU) Commercial Alteration$247K
    Record
    2005081051
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2445 E Ledbetter Dr

What is being built at 2445 E Ledbetter Dr?

A City of Dallas permit describes a locker room addition next to the baseball field at Todd Middle School. The permit, COM-ALT-ADD-26-000717, was filed March 27, 2026.

Is Todd Middle School getting new locker rooms?

A March 27, 2026, City of Dallas permit describes an addition of locker rooms next to the school's baseball field. The record does not provide the addition's size or cost.

When was the locker room addition permitted?

The City of Dallas permit for the locker room addition was filed March 27, 2026. Its permit number is COM-ALT-ADD-26-000717.

What other work is permitted at 2445 E Ledbetter Dr?

December 2025 permits cover plumbing for a restroom, electrical apparatus, and HVAC ductwork and inspections at the school. The plumbing permit describes one sink, one toilet, and one floor drain.

Is a new school being built at 2445 E Ledbetter Dr?

The records describe work at an existing school, including a locker room addition and mechanical, plumbing, and electrical work. They do not describe construction of a new school.

Also being built nearby

All of 75216

More schools & daycares in 75216.

Get alerts for 2445 E Ledbetter Dr