2620 Volga Ave
Dallas, TX 75216
Electrical service repair permitted at 2620 Volga Ave
A residential electrical permit indicates a repair to the main service after weather damage at 2620 Volga Ave. The City of Dallas permit was filed March 30, 2026.
Summarized from City of Dallas records · updated Mar 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 30, 2026
- since Mar 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2620 Volga Ave
What is happening at 2620 Volga Ave in Dallas?
A City of Dallas residential electrical permit indicates a repair to the main electrical service after weather damage. It was filed March 30, 2026.
Is a new home being built at 2620 Volga Ave?
The record is for a residential electrical service repair, not a new-home construction permit. It was filed March 30, 2026.
What electrical work was permitted at 2620 Volga Ave?
The permit description says the main service needed repair because of weather damage. The record does not provide further work details.
When was the electrical permit filed for 2620 Volga Ave?
The City of Dallas filed permit RES-ELC-26-001790 on March 30, 2026.
How many permits are listed for 2620 Volga Ave?
The record lists one City of Dallas permit: RES-ELC-26-001790, filed March 30, 2026.
Also being built nearby
All of 75216- 2621 Volga AveJul 27, 2026Gas test only · 13 m away
- 2606 Volga AveNov 8, 2020Electrical repairs · 40 m away
- 2646 Volga AveAug 14, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment.erie to furnish and install decking with osb where applicable · 74 m away
- 2647 Volga AveSep 8, 2026Full system install · 75 m away
- 2650 Volga AveMay 22, 2025Repair service due to storm · 85 m away
- 2655 Volga AveNov 12, 2026Replace gas yard service line · 97 m away
- 2632 Jennings AveJun 11, 2025Replaced vented wall furnace · 101 m away
- 2602 Jennings AveNov 8, 2020Upgrade existing electrical service · 108 m away
- 2647 Jennings AveAug 31, 2026Replace vented wall furnace · 111 m away
- 2650 Jennings AveSep 8, 2026Gas test · 128 m away
- 2654 Jennings AveJul 16, 2026Replace sewer line · 136 m away
- 2669 Volga AveOct 23, 20264-ton condenser with 88k btus furnace changeout · 137 m away