2759 Ann Arbor Ave
Dallas, TX 75216
Residential electrical panel upgrade at 2759 Ann Arbor Ave
A residential electrical permit for a panel upgrade at 2759 Ann Arbor Ave was filed on August 3, 2026. The City of Dallas record lists permit RES-ELC-26-004601 and does not specify a project value or square footage.
Summarized from City of Dallas records · updated Aug 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 3, 2026
- since Aug 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2759 Ann Arbor Ave
What is being built at 2759 Ann Arbor Ave?
The City of Dallas record is for a residential electrical panel upgrade, not a new building. Permit RES-ELC-26-004601 was filed August 3, 2026.
What work is planned at 2759 Ann Arbor Ave in Dallas?
The permit description says “Panel upgrade.” It is listed as a residential electrical permit filed August 3, 2026.
When was the permit filed for 2759 Ann Arbor Ave?
The City of Dallas filed residential electrical permit RES-ELC-26-004601 on August 3, 2026.
Is a new home being built at 2759 Ann Arbor Ave?
The available record lists a panel upgrade, not new home construction. It does not provide details about other work at the property.
How much will the panel upgrade at 2759 Ann Arbor Ave cost?
The permit record does not report a project value or cost estimate.
Also being built nearby
All of 75216- 2736 Ann Arbor AveSep 30, 202650 ft of gas line and gas test · 39 m away
- 2739 Ann Arbor AveJul 18, 2025Permit r e q u e s t :i am requesting a permit to construct a concrete approach -driveway at my property at2739 e. ann arbor ave dallas, tx 75216attached you will find the $10k paving bond that was requested.this will be a private work - done by myself & my husband.11'6" x 5’this work will include the following:excavation and grading of the existing ground to prepare for concrete installation.forming and pouring concrete for the approachuse of standard construction materials, including gravel base, rebar or mesh reinforcement, andready-mix c o n c r e t e.removal and proper disposal of any existing debris, vegetation, or deteriorated materials.ensuring the approach does not interfere with utilities, drainage, sidewalks, or publicinfrastructure · 63 m away
- 2770 Moffatt AveDec 2, 2025Installing an 8ft fence that will be placed along the side yard and rear yard · 94 m away
- 2763 Moffatt AveJul 18, 2026New hvac · 102 m away
- 2771 Moffatt AveJul 25, 2025Gas test · 106 m away
- 2780 Moffatt AveSep 12, 20254 stp, 888lf of reset/reshim, (2) 24x24x24 spread footing with precast blocks · 109 m away
- 2821 Kilburn AveSep 23, 2026Replace sewer line from house to city tap · 126 m away
- 2817 Kilburn AveJan 21, 2021Service release no work · 130 m away
- 2731 Moffatt AveApr 8, 20263 ton electric complete system'run new ductwork · 147 m away
- 4438 Tacoma StMar 5, 2026Install 4 ron electric hvac system · 157 m away
- 4505 Tacoma StNov 25, 2025Gas relay/test · 186 m away
- 2917 Modree AveJun 18, 2026Install 50 gallon gas water heater in kitchen closet · 203 m away