3402 Alabama Ave
Dallas, TX 75216
3402 Alabama Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 3402 Alabama Ave, Dallas, TX 75216 since September 30, 2020. The most recent, filed October 8, 2020, covers: “Upgrade existing electrical service”.
Compiled from City of Dallas records · updated Oct 8, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Oct 8, 2020
- since Sep 30, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 3402 Alabama Ave
What is being built at 3402 Alabama Ave?
The latest filing (City of Dallas permit 2010083039, October 8, 2020) covers upgrade existing electrical service.
How many permits and filings does 3402 Alabama Ave have?
2 filings across 2 projects, from September 30, 2020 to October 8, 2020.
How much is the construction at 3402 Alabama Ave worth?
Permits at this address list about $1 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Dallas ISD in Dallas?
3402 Alabama Ave is about 240 m from Dallas ISD (303 East Overton Road). Its latest filing is for upgrade existing electrical service.
Is there other construction near 3402 Alabama Ave?
Yes. Nearby filings include 3414 Arizona Ave (run gas line from meter to house, Jun 3, 2025); 3418 Ramsey Ave (electrical work for residential remodel, May 12, 2025); 3335 Arizona Ave (battery energy storage system 01 tesla: powerwall 3 1707000-xx-y 11.5 kw (240v) 01 tesla gateway 3, May 21, 2026).
How do I get alerts for new permits at 3402 Alabama Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75216- 3414 Arizona AveJun 3, 2025Run gas line from meter to house · 111 m away
- 3418 Ramsey AveMay 12, 2025Electrical work for residential remodel · 112 m away
- 3335 Arizona AveMay 21, 2026Battery energy storage system 01 tesla: powerwall 3 1707000-xx-y 11.5 kw (240v) 01 tesla gateway 3 · 149 m away
- 3325 Arizona AveSep 3, 2025Gas relay · 161 m away
- 3328 Arizona AveApr 13, 20264 ton electric complete systemrun new ductwork · 165 m away
- 3321 Arizona AveJun 4, 2026200 amp service · 166 m away
- 3324 Ramsey AveJan 24, 2021Gas relay or repair with test · 169 m away
- 3316 Arizona AveJun 22, 2026Replacing existing approach and driveway. these will be wider. 18ft wide same length.**i've looked in where i can upload docs (survey, etc) please advise where to do so, online interface goes from step 2, to step 4. skips step 3.) · 179 m away
- 3310 Ramsey AveNov 12, 2025Install new sewer main from house to city easement- have underground utilities located if needed and obtain a city permit. excavate from the house to the utility easement and expose the existing sewer and city riser if applicable. cut out the existing sewer line and then precision grade trench for proper slope. connect at the main trunk line where it exits the house and install a new schedule 40 pvc sewer and connect to the city riser if applicable. install 4” scheduled 40 two way pvc clean-outs. have city inspect the new piping. backfill and compact trench, clean up worksite and haul away debris · 186 m away
- 3307 Ramsey AveJan 6, 2026Service upgrade · 199 m away
- 3418 Michigan AveJul 7, 2026Nsfaa-addition of front and back to an existing house · 215 m away
- 3402 Seevers AveJan 4, 2026Gas test for meter release. gas test only, no repairs. gas provider requesting city approval · 224 m away
More solar installs in 75216.