3558 Wilhurst Ave
Dallas, TX 75216 · Royal Crest Apartments
Royal Crest Apartments interior remodel in Dallas
An 85,000-square-foot interior remodel with minimal site improvements is listed for Royal Crest Apartments at 3558 Wilhurst Ave. The Texas Department of Licensing and Regulation project registration was filed on November 9, 2024, and is marked review complete. The applicant’s estimated project cost is $11,244,050.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 9, 2024
- since Nov 9, 2024
- Largest scope
- 85,000 sf
- Estimated cost
- $11M
- state registration
Where this project stands
Finishing up · inspection nextRoyal Crest Apartments
85,000 sq ft · $11M est.
- RegisteredNov 9, 2024
- Plan review
- ConstructionMar '25 – Oct '25
- Inspectednow
- Closed
Scheduled to finish Oct 31, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior remodel with minimal site improvements — royal crest
TDLR project registrationRenovation/AlterationReview Complete85,000 sq ft$11M est.- Project #
- TABS2025005204
- Tenant / owner
- Royal Crest Apartments
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3558 Wilhurst Ave
What is being built at 3558 Wilhurst Ave in Dallas?
The TDLR registration describes an interior remodel with minimal site improvements at Royal Crest Apartments, not a new apartment building. It lists 85,000 square feet of work.
When was the Royal Crest Apartments project filed?
The TDLR registration, project TABS2025005204, was filed on November 9, 2024. Its status is listed as review complete.
Is Royal Crest Apartments getting a new building?
The registration describes a renovation and alteration for an interior remodel with minimal site improvements. It does not describe construction of a new building.
How much will the Royal Crest Apartments remodel cost?
The applicant’s TDLR estimate for the project is $11,244,050. This is an estimate, not a reported final cost.
How large is the Royal Crest Apartments remodel?
The TDLR registration lists the project at 85,000 square feet.
Also being built nearby
All of 75216- 3558 Wilhurt AveSep 9, 2026Electrical feeder conductors from the transformer to the building's will need to be rerouted into enclosures so metering devices may be installed for pcs limiting equipment required by the utility company (oncore)
- 3556 Wilhurt AveMar 6, 2026Replace dwv from slab to vtr. demolition all existing plumbing fixtures and install new plumbing fixtures. inspection phase #262-269 · 7 m away
- 3564 Wilhurt AveMar 6, 2026Replace dwv from slab to vtr. demolition all existing plumbing fixtures and install new plumbing fixtures. inspection phase #270-277 · 20 m away
- 3548 Wilhurt AveMar 6, 2026Replace dwv from slab to vtr. demolition all existing plumbing fixtures and install new plumbing fixtures. inspection phase #254-261 · 33 m away
- 3572 Wilhurt AveMar 6, 2026Equipment exchange and ductwork replacementinspection phase #278 - 285 · 46 m away
- 3540 Wilhurt AveMar 6, 2026Equipment changeout and ductwork replacement inspection phase #146-153 · 59 m away
- 3580 Wilhurt AveMar 6, 20261 ice maker, 1 electric water cooler (drinking fountain), water heaters 3 tankless gas, 1 lint interceptor, 12 washer valve boxes -- under slab plumbing for lint interceptor and bathrooms · 72 m away
- 3520 Wilhurt AveMay 30, 2025Remodel 1 bathroom · 124 m away
- 3516 Wilhurt AveJul 9, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment.erie to furnish and install decking with osb where applicable · 137 m away
- 3512 Wilhurt AveMar 4, 2025Continuation permit from permit # 2209231011 · 151 m away
- 3601 E Illinois AveJul 16, 2025New addition (2nd floor) 870 sqf · 169 m away
- 3401 Linfield RdMar 5, 2026Replace dwv from slab to vtr. demolition all existing plumbing fixtures and install new plumbing fixtures. inspection phase #118-125 · 178 m away