House demolition permitted at 3918 Le May Ave
A City of Dallas permit filed August 11, 2026, authorizes demolition of the house structure and removal of its concrete foundation at 3918 Le May Ave. The application says debris will be taken to the local landfill it identifies; the record covers demolition, not replacement construction.
Summarized from City of Dallas records · updated Aug 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 11, 2026
- since Aug 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectThe structure of the house will be torn down and the concrete foundation will be broken up. trash will be disposed at the local landfill described in this application
The structure of the house will be torn down and the concrete foundation will be broken up. trash will be disposed at the local landfill described in this application
City of Dallas permitResidential Demolition Permit
Sources: City of Dallas
Questions about 3918 Le May Ave
What is happening at 3918 Le May Ave in Dallas?
A City of Dallas residential demolition permit authorizes tearing down the house and breaking up its concrete foundation. The permit was filed August 11, 2026.
What is permit RES-DEM-26-000725 for?
Permit RES-DEM-26-000725 covers demolition of the house structure and concrete foundation at 3918 Le May Ave. It was filed with the City of Dallas on August 11, 2026.
Is a new house planned at 3918 Le May Ave?
The available City of Dallas record is for demolition only and does not list replacement construction.
When was demolition permitted at 3918 Le May Ave?
The residential demolition permit was filed August 11, 2026, under permit number RES-DEM-26-000725.
Is a house also being demolished next to 3918 Le May Ave?
A separate demolition application was filed for 3902 Le May Ave on August 18, 2026. It describes removal of a house structure and its concrete foundation.
Also being built nearby
All of 75216- 3902 Le May AveAug 18, 2026The structure of the house will be torn down and the concrete foundation will be broken up. trash will be disposed at the local landfill described in this application · 15 m away
- 3823 Le May AveOct 22, 2025Install all new electrical service and wire · 85 m away
- 3815 Le May AveMay 6, 2025New build association permit number 2406141050 · 88 m away
- 3814 Le Forge AveJan 15, 2026Our contractor will demolish the house on 3814 le forge ave and depose of all the trash to mccommas bluff landfill in dallas, tx. they will put up safety tape each day until the job is completed · 110 m away
- 3818 Le Forge AveAug 20, 2025New construction · 112 m away
- 4350 Kolloch DrFeb 2, 2026Replace approximately 75 linear feet of exterior building sewer from existing cleanout to existing cleanout, running beneath the driveway and playground · 233 m away
- 4331 Kolloch DrNov 7, 2025Service upgrade · 278 m away
- 3503 Linfield RdOct 30, 2025Gas line relocation for atmos energy · 328 m away
- 3915 Linfield RdNov 14, 2025Tear off modified bitumen roof. install a 4” iso board roof insulation. apply one ply of tpo membrane 60 mill · 346 m away
- 3433 Linfield RdMar 4, 2026Replace dwv from slab to vtr. demolition all existing plumbing fixtures and install new plumbing fixtures. inspection phase #142 - 145 · 350 m away
- 3427 Linfield RdMar 6, 2026Replace dwv from slab to vtr. demolition all existing plumbing fixtures and install new plumbing fixtures. inspection phase #234-241 · 368 m away
- 3417 Linfield RdMar 5, 2026Replace dwv from slab to vtr. demolition all existing plumbing fixtures and install new plumbing fixtures. inspection phase #126-133 · 394 m away