4216 Kushla Ave
Dallas, TX 75216
Electrical work permitted at 4216 Kushla Ave
City of Dallas permits indicate electrical work at the address, not a new building project. A whole-house rewire was permitted on November 6, 2020, and a permit to fix the electrical service was filed on June 5, 2025.
Summarized from City of Dallas records · updated Jun 5, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 5, 2025
- since Nov 6, 2020
- Largest scope
- —
- Listed value
- $725
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 4216 Kushla Ave
What is being built at 4216 Kushla Ave?
The records show electrical work at the address, including a whole-house rewire and an electrical service repair. They do not indicate a new building project.
Is a new building going up at 4216 Kushla Ave?
The two City of Dallas records describe electrical work, not new construction.
What electrical work was permitted at 4216 Kushla Ave?
A whole-house rewire was permitted under record 2011066021 on November 6, 2020. Permit RES-ELC-25-000576, filed June 5, 2025, is for fixing the electrical service.
When was the latest permit filed for 4216 Kushla Ave?
The latest listed permit was filed June 5, 2025, for an electrical service repair.
What does permit RES-ELC-25-000576 cover?
The City of Dallas permit, filed June 5, 2025, describes work to fix the electrical service.
Was the whole house rewired at 4216 Kushla Ave?
A City of Dallas permit filed November 6, 2020, describes rewiring the whole house.
Also being built nearby
All of 75216- 4205 Kushla AveAug 24, 20263 ton base upflow gas system · 17 m away
- 1222 Exeter AveJul 2, 2026Gas test + repairs - meter locked · 49 m away
- 1221 Exeter AveJun 5, 2026Leak detection and repair on gas service lines that feed water heater and furnace · 50 m away
- 1225 Exeter AveJan 8, 2021Gas relay or repair with test · 57 m away
- 4125 Kushla AveAug 25, 20251. remove all old roofing components down to decking 2. install a whole new roofing system with all required components · 84 m away
- 4120 Kushla AveJan 7, 2021Gas test · 86 m away
- 1241 Exeter AveMay 5, 2026Replacing one 40 gal water heater · 89 m away
- 1242 Exeter AveNov 12, 2026Gas line pressure test to get her gas back on at the house · 90 m away
- 1245 Exeter AveNov 17, 2020Gas relay or repair with test · 97 m away
- 1241 E Ann Arbor AveDec 18, 2025Install new plumbing in shower and relocate valve, relocate shower drain, relocate water source and plumb vanity and toilet · 163 m away
- 4025 Kushla AveSep 23, 2026Gas check and water heater inspection · 184 m away
- 1020 Ann Arbor AveDec 8, 2025Gas test · 190 m away