550 Ann Arbor Ave
Dallas, TX 75216
Water heater replacement permitted at 550 Ann Arbor Ave
A commercial plumbing permit for water heater replacement at 550 Ann Arbor Ave was filed with the City of Dallas on November 6, 2026. The record does not specify the scope beyond the replacement.
Summarized from City of Dallas records · updated Nov 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2026
- since Nov 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 550 Ann Arbor Ave
What work is permitted at 550 Ann Arbor Ave in Dallas?
A City of Dallas commercial plumbing permit covers water heater replacement. It was filed November 6, 2026, under permit COM-PLM-26-004280.
Is a new building being built at 550 Ann Arbor Ave?
The recorded permit is for water heater replacement, not new construction.
When was the water heater replacement permit filed?
The City of Dallas filed the commercial plumbing permit on November 6, 2026.
What is permit COM-PLM-26-004280 for?
The permit description is “Water heater replacement” at 550 Ann Arbor Ave, Dallas.
Does the permit list a project cost or size?
The record does not list a valuation or square footage.
Also being built nearby
All of 75216- 550 E Ann Arbor AveJan 4, 2021Replace 4'' rpz
- 4323 Vanette LnFeb 16, 2026Electrical remodel · 83 m away
- 4334 Vanette LnJan 16, 2026Nsfaa add wooden patio cover · 92 m away
- 4393 S Marsalis AveApr 22, 2026Installing a new electrical pedestal to provide power to traffic signals · 171 m away
- 4247 Summit Ridge DrJun 2, 2026Gas pressure test · 180 m away
- 4255 Summit Ridge DrMar 23, 2026Construction of a small attached room addition located in the rear yard of an existing residential property. the structure will be connected to the rear portion of the house and will have exterior access only, with entry from the outside and no direct interior connection to the main house.the addition will measure approximately 5.05 feet in width, 11.05 feet in length, and 9.05 feet in height. the structure will be elevated approximately 2 feet above ground level and supported by a raised platform system.the scope of work includes wood framing, subfloor installation, roofing, insulation, drywall, and interior finishes. the project will also include installation of electrical wiring and plumbing connections to accommodate a bathroom within the addition.all work will be performed in compliance with applicable local building codes, zoning regulations, and safety requirements · 184 m away
- 4420 S Marsalis AveOct 28, 2026New service and wiring for unit a and new service and wiring for unit b · 189 m away
- 717 E Ann Arbor AveNov 16, 2026Service upgrade, 200a 3p 208vnew light fixtures, wiring and devices · 203 m away
- 717 Ann Arbor AveOct 26, 2026Water heater replacement · 203 m away
- 727 Ann Arbor AveMar 19, 2026Installing a new fence 6 ft tall · 216 m away
- 4216 Vanette LnJan 28, 2021Foundation repair · 220 m away
- 4456 S Marsalis AveOct 9, 2025Clean and show · 222 m away