1441 N Jim Miller Rd
Dallas, TX 75217
Electrical service work permitted at 1441 N Jim Miller Rd
Commercial electrical permits at 1441 N Jim Miller Rd cover utility service work at multiple buildings, including installation of 400–600 amp transockets and disconnects. The City of Dallas filed records from March 20 through March 25, 2026.
Summarized from City of Dallas records · updated Mar 25, 2026
- Projects
- 21
- 21 filings
- Latest filing
- Mar 25, 2026
- since Mar 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
21 projectsBuilding 4 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 4 dallas texas 75217
Building 4 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 4 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 3 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 3 dallas texas 75217
Building 3 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 3 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 2 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 2 dallas texas 75217
Building 2 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 2 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 11 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 11 dallas texas 75217
Building 11 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 11 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 19 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 19 dallas texas 75217
Building 19 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 19 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 17 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 17 dallas texas 75217
Building 17 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 17 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 13 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 13 dallas texas 75217
Building 13 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 13 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 21 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 21 dallas texas 75217
Building 21 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 21 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 10 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 10 dallas texas 75217
Building 10 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 10 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 9 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 9 dallas texas 75217
Building 9 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 9 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 8 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 8 dallas texas 75217
Building 8 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 8 dallas texas 75217
City of Dallas permitCommercial Electrical PermitBuilding 7 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 7 dallas texas 75217
Building 7 of 21 we are installing a 400a - 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing meter base. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket to a 400-600a disconnect then back to meter base. we have 21 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 1441 n jim miller building 7 dallas texas 75217
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 1441 N Jim Miller Rd
What is being built at 1441 N Jim Miller Rd in Dallas?
City of Dallas permits indicate electrical service work at multiple buildings, including new utility transockets and disconnects. The records are dated March 20–25, 2026.
What work is planned at 1441 N Jim Miller Rd?
Permit descriptions specify replacing the connection from existing overhead utility conductors to the meter base with a 400–600 amp utility transocket and disconnect. The filings cover multiple buildings at the property.
When were permits filed for 1441 N Jim Miller Rd?
The City of Dallas records span March 20 to March 25, 2026. The detailed electrical permit descriptions are dated March 20.
How many permits were filed for 1441 N Jim Miller Rd?
The fact sheet lists 21 City of Dallas permit records for the address. They are commercial electrical permits.
Are the permits for new construction at 1441 N Jim Miller Rd?
The listed permits are for commercial electrical work, including utility service changes. They do not describe construction of a new building.
What does permit COM-ELC-26-001199 cover?
The March 20, 2026 permit description covers a 400–600 amp utility transocket and disconnect for a building at 1441 N Jim Miller Rd.
Also being built nearby
All of 75217- 1437 Celeste DrJul 25, 2025Nsfaa-this project involves the construction of a detached two-car carport on a residential lot. the carport is designed to provide covered parking for two vehicles and protection from sun, rain, and snow. it will be a freestanding, open-sided structure, not attached to the primary residence. the design complies with local building codes, zoning setbacks, and residential construction standards · 113 m away
- 7214 Charles CtDec 2, 2020Replace or modify existing hvac · 154 m away
- 1349 Celeste DrDec 2, 2020Foundation repair · 175 m away
- 7224 Charles CtOct 19, 2026Installation of a complete gas hvac system including the gas furnace, condenser, ductwork and supply and return vents · 176 m away
- 1328 N Jim Miller RdOct 2, 2025Repair meter base · 193 m away
- 7221 Wallace StNov 16, 2020Install water heater · 198 m away
- 1343 Celeste DrOct 1, 2025Re-roof · 201 m away
- 7218 Wallace StDec 21, 2020Gas test · 206 m away
- 7106 Amy AveDec 29, 2020Gas relay or repair with test · 208 m away
- 7222 Wallace StJun 11, 2025The riser conduit for service was damaged during recent storm. conduit needs to be replaced and properly supported and service feeder wires will be checked for damage and replaced if necessary · 210 m away
- 7244 Charles CtOct 31, 2025Replacement of gas pipe · 219 m away
- 7121 Amy StSep 11, 2025Salvador favela pv installation: 27 q.cells q.tron blk m-g2.h+430 roof mounted solar photovoltaic modules, system size: 11.61 kw dc stc, system size: 10.26 kw ac · 220 m away