1540 Gardenside Dr
Dallas, TX 75217
Residential new construction permitted at 1540 Gardenside Dr
A residential new-construction permit was filed for 1540 Gardenside Dr on July 11, 2025. Dallas permits filed through February 17, 2026, also cover electrical work, plumbing, HVAC, and an 8-foot rear fence.
Summarized from City of Dallas records · updated Feb 17, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Feb 17, 2026
- since Jul 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 1540 Gardenside Dr
What is being built at 1540 Gardenside Dr?
A City of Dallas residential new-construction permit was filed on July 11, 2025. The permit description is “Nsfaa,” so the records provided do not specify further details.
When was the new-construction permit filed for 1540 Gardenside Dr?
The residential new-construction permit, RES-NEW-25-000021, was filed July 11, 2025.
What other permits were filed for 1540 Gardenside Dr?
The records include electrical, plumbing, mechanical, and residential accessory-structure permits. The latest listed permit is for a new plumbing system, filed February 17, 2026.
Was a fence permitted at 1540 Gardenside Dr?
Yes. Permit RES-ACC-26-000109, filed January 28, 2026, describes an 8-foot fence along the property's rear boundary.
Was HVAC work permitted at 1540 Gardenside Dr?
A residential mechanical permit filed September 29, 2025, describes new HVAC work. The record is permit RES-MEC-25-002866.
How many permits are listed for 1540 Gardenside Dr?
The records list six City of Dallas permits, filed from July 11, 2025, through February 17, 2026.
Also being built nearby
All of 75217- 1535 Gardenside DrJul 31, 2026Route new 1-1/4 poly gas pipe underground including trenching approx. 60 feet from the gas meter and set test for inspection · 15 m away
- 10327 Springhaven DrJan 18, 2021Electrical repairs · 53 m away
- 10336 Springhaven DrJul 28, 2026Replacing 60ft of gas line from meter to house. install new isolation valve and two 1" gas risers, upgraded ac gas inlet with hard pipe and sediment trap, and added a new 1/2" gas stop to ensure safe, code- compliant operation of homes gas system · 76 m away
- 10315 Checota DrSep 11, 2020Upgrade existing electrical service · 78 m away
- 10342 Springhaven DrJan 29, 2026Gas test · 87 m away
- 10333 Checota DrFeb 12, 2026Gas test with 40 ft of new gas line · 91 m away
- 10346 Springhaven DrNov 9, 2026Replace gas yard service and gas piping under the structure · 95 m away
- 10341 Checota DrDec 22, 2025Gas pressure test · 99 m away
- 10125 Mesita DrAug 6, 2025Ars to replace main building sewer line and make spot repair on main building drain line · 186 m away
- 1605 Allentown DrSep 28, 2020Repair leak at gas meter · 198 m away
- 10338 Castlerock DrJul 23, 20265 ton base upflow gas system · 201 m away
- 10342 Castlerock DrDec 4, 2020Foundation repair · 204 m away