1922 S Buckner Blvd
Dallas, TX 75217
Gas supply test and repair permitted at 1922 S Buckner Blvd
A commercial plumbing permit for a gas supply test and repair at 1922 S Buckner Blvd was filed on January 21, 2026. The City of Dallas record does not specify a new building or tenant.
Summarized from City of Dallas records · updated Jan 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 21, 2026
- since Jan 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1922 S Buckner Blvd
What is happening at 1922 S Buckner Blvd in Dallas?
A City of Dallas commercial plumbing permit records gas supply testing and repair. The permit, COM-PLM-26-000226, was filed January 21, 2026.
Is a new building being built at 1922 S Buckner Blvd?
The available permit records describe gas supply testing and repair, not construction of a new building.
What does permit COM-PLM-26-000226 cover?
The City of Dallas record describes the work as a gas supply test and repair. It was filed January 21, 2026.
When was the gas work at 1922 S Buckner Blvd permitted?
The commercial plumbing permit was filed on January 21, 2026.
Is a business opening at 1922 S Buckner Blvd?
The permit record does not name a business or indicate that a business is opening. It covers gas supply testing and repair.
Also being built nearby
All of 75217- 1910 S Buckner BlvdNov 18, 2020Remodel existing plumbing · 30 m away
- 8095 Tillman StSep 12, 2025Installing new traffic signal at intersection buckner blvd at tillman st · 65 m away
- 1837 S Buckner BlvdAug 17, 2026Apply gas test for service reinstatement · 154 m away
- 1801 S Buckner BlvdJan 30, 2026Replace rpz at soda system · 202 m away
- 1822 Conner DrJun 26, 2026Replace gas lines under home · 223 m away
- 1816 Conner DrJan 17, 2026There was a gas leak so the meter was shut off by atmos. we repaired the leak and tested the gas piping · 229 m away
- 2010 S Buckner BlvdMay 29, 2026Mcr i had 5 suites and took down 3 walls to make 2 suites i cant rent so i need to put 3 non load bearing walls back in place to make a total of 5 suites in the front and would like them to be 5 suites again · 231 m away
- 2014 S Buckner BlvdMay 20, 2025Existing service only panel repairs. vacant building. must obtain a co prior to occupying space · 241 m away
- 8017 Huttig AveSep 18, 2020Electrical remodel · 247 m away
- 8003 Huttig AveSep 4, 2026Remove and replace existing main electrical service panel with new 200-ampere main breaker panel. install new grounding electrode system with #4 copper grounding electrode conductor and ground rod, establishing proper electrical grounding per national electrical code (nec). this residence previously lacked a compliant grounding system. all work to comply with current nec standards and local electrical codes.panel replacement (200a)new grounding electrode system (#4 copper)the fact that it's a new grounding system for the homecode compliance · 258 m away
- 7936 Tillman StApr 14, 2026Installation of gas main from meter to house. will also ran new gas line for stove top and hot water heather · 259 m away
- 1944 Utica DrAug 19, 2026Replace 2.5 ton complete gas system · 266 m away