1982 Oak Hill Cir
Dallas, TX 75217
Gas pressure test permit filed at 1982 Oak Hill Cir
A City of Dallas residential plumbing permit for a gas pressure test was filed at 1982 Oak Hill Cir on September 22, 2026. The record does not describe new construction.
Summarized from City of Dallas records · updated Sep 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2026
- since Sep 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1982 Oak Hill Cir
What is being built at 1982 Oak Hill Cir?
The City of Dallas record lists a residential plumbing permit for a gas pressure test, not a new building project.
What work is the permit for at 1982 Oak Hill Cir?
It is for a gas pressure test. The permit number is RES-PLM-26-010126.
When was the gas pressure test permit filed?
The City of Dallas filed the residential plumbing permit on September 22, 2026.
Is a new home being built at 1982 Oak Hill Cir?
The available record does not indicate new home construction. It lists only a gas pressure test permit.
Who filed the permit for 1982 Oak Hill Cir?
The source is the City of Dallas. The record does not identify an occupant or owner.
Also being built nearby
All of 75217- 1983 Oak Hill CirDec 29, 2020Foundation repair · 14 m away
- 8744 Milverton DrSep 4, 2026Re-roof structure with new synthetic underlayment, fiberglass shingles and all needed accessories · 101 m away
- 8728 Milverton DrSep 22, 2026Replace meter · 104 m away
- 2037 Holcomb RdJan 8, 2026Gas test · 124 m away
- 1940 Holcomb RdOct 6, 2025Gas test · 155 m away
- 8822 Donnybrook LnMar 4, 2026Gas test · 159 m away
- 1943 Holcomb RdAug 28, 2026Mcr with battery install a new rooftop pv+battery system design 31 modules - 12.710 kw dc, 8.990 kw ac system size with an mpu (main panel upgrade)system size: 12.710kw dc / 8.990kw ac system sizepv module: (31) amps solar amps-410p-54bbinverter: (15) duracell power center d600-m2a-240a {240v}(1) duracell power center d350-m2a-240a {240v}combiner: (1) minimum 125a pv ac combinerac disconnect: (1) 60a non-fused ac disconnectbreaker enclosure: (1) 200a main breaker enckosure with 200a breakersystem controller: (1) duracell power center max hybrid 15battery: (8) duracell power center dura 5gateway: (1) duracell-dtu sol-vppl-rgmrapid shutdown initiator: (1) e-stop switch (model # imo pe69-3020l)protection device: (1) surge protection device · 160 m away
- 1928 Holcomb RdNov 7, 2025Gas test · 174 m away
- 8822 Palisade DrSep 4, 2025Meter baserepair and restore service · 180 m away
- 8838 Donnybrook LnMay 21, 2025Gas pressure test · 189 m away
- 1924 Oak Hill CirOct 14, 2025Gas test · 207 m away
- 8438 Huttig AveJan 13, 2026Gas meter relocate · 209 m away