5000 Great Trinity Forest Way
Dallas, TX 75217
Fitness center planned inside existing storage space in Dallas
Dallas permits indicate electrical remodeling to add a fitness center in pre-existing storage space at 5000 Great Trinity Forest Way. An interior alteration permit was filed November 20, 2025, followed by an electrical permit filed March 13, 2026.
Summarized from City of Dallas records · updated Mar 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 13, 2026
- since Nov 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsElectrical remodel work to incorporate the addition of fitness center in pre-existing storage space
Electrical remodel work to incorporate the addition of fitness center in pre-existing storage space
City of Dallas permitCommercial Electrical PermitScope of work: selective demolition, walls, doors, mep haul off, interior, stair nosing/riser with tile, interior handrail, finish carpentry & millwork, solid surface countertop, interior door/frame/hardware, mirrors, install single door frame and door, interior partition patching from demolition, interior partitions, gypsum board ceiling, 24"x48" floor tile for stairs, 24"x48" large format floor tile, rectangle wall tile, rubber flooring, tape/bed/paint, fire protection system, wet system -add/modify sprinkler heads, mechanical systems, test and balance, lighting fixtures, voice/data communication infrastructure, fire alarm system
Scope of work: selective demolition, walls, doors, mep haul off, interior, stair nosing/riser with tile, interior handrail, finish carpentry & millwork, solid surface countertop, interior door/frame/hardware, mirrors, install single door frame and door, interior partition patching from demolition, interior partitions, gypsum board ceiling, 24"x48" floor tile for stairs, 24"x48" large format floor tile, rectangle wall tile, rubber flooring, tape/bed/paint, fire protection system, wet system -add/modify sprinkler heads, mechanical systems, test and balance, lighting fixtures, voice/data communication infrastructure, fire alarm system
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 5000 Great Trinity Forest Way
What is being built at 5000 Great Trinity Forest Way?
Dallas permit records indicate a fitness center is being added in pre-existing storage space. The work includes electrical remodeling under permit COM-ELC-26-001128, filed March 13, 2026.
Is there a new gym coming to 5000 Great Trinity Forest Way?
A Dallas electrical permit describes work to incorporate a fitness center in existing storage space. The record does not identify an opening date.
When was work permitted at 5000 Great Trinity Forest Way?
Dallas records show an interior alteration permit filed November 20, 2025, and an electrical permit filed March 13, 2026.
What interior work is planned at 5000 Great Trinity Forest Way?
The alteration permit describes selective demolition and interior work including partitions, flooring, stairs, lighting, mechanical systems, and fire protection. Permit COM-ALT-ADD-25-000533 was filed November 20, 2025.
Does the project at 5000 Great Trinity Forest Way involve a new building?
The permits describe interior alterations and electrical remodeling in pre-existing storage space, including work to incorporate a fitness center. They do not describe construction of a new building.