521 S Buckner Blvd
Dallas, TX 75217
521 S Buckner Blvd: 1 project on record
City of Dallas lists 1 filing across 1 project at 521 S Buckner Blvd, Dallas, TX 75217. The most recent, filed January 8, 2021, covers: “Install new roof over existing roof”.
Compiled from City of Dallas records · updated Jan 8, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 8, 2021
- since Jan 8, 2021
- Largest scope
- —
- Listed value
- $12
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 521 S Buckner Blvd
What is being built at 521 S Buckner Blvd?
The latest filing (City of Dallas permit 2101086014, January 8, 2021) covers install new roof over existing roof.
How many permits and filings does 521 S Buckner Blvd have?
1 filing across 1 project, from January 8, 2021 to January 8, 2021.
How much is the construction at 521 S Buckner Blvd worth?
Permits at this address list about $12 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 521 S Buckner Blvd?
Yes. Nearby filings include 8123 Elam Rd (gas test, Jan 4, 2021); 477 S Buckner Blvd (txdot 0581-01-165_dallas_traf signal improv- electrical permit request for installation of traffic signal poles, signal heads, conduit, wiring, and controller equipment. work also includes electrical connections, testing, and coordination to ensure proper operation of upgraded traffic signal systems in accordance with project plans, Jul 20, 2026); 552 S Buckner Blvd (gas line to generator, Jul 21, 2026).
How do I get alerts for new permits at 521 S Buckner Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75217- 8123 Elam RdJan 4, 2021Gas test · 83 m away
- 477 S Buckner BlvdJul 20, 2026Txdot 0581-01-165_dallas_traf signal improv- electrical permit request for installation of traffic signal poles, signal heads, conduit, wiring, and controller equipment. work also includes electrical connections, testing, and coordination to ensure proper operation of upgraded traffic signal systems in accordance with project plans · 83 m away
- 552 S Buckner BlvdJul 21, 2026Gas line to generator · 190 m away
- 8202 Elam RdAug 27, 2025Re-roof, remove and replace shingles · 206 m away
- 401 S Buckner BlvdNov 18, 2026Level 4 phase 6 · 231 m away
- 570 S Buckner BlvdJun 2, 20256ft metal fence in front and 8ft in the back · 241 m away
- 7926 Rilla AveMay 4, 2026Upgrade service · 262 m away
- 7923 Wes Hodges RdDec 29, 2020Gas relay or repair with test · 269 m away
- 7907 Wes Hodges RdDec 17, 2025Replace gas line · 286 m away
- 7943 Rilla AveAug 19, 2026The installation includes 33 q.peak duo blk ml-g10.c+ 410 pvmodules, 1 solaredge use11400h-usskbez8, and safetyequipment · 287 m away
- 7919 Dasch StOct 27, 2020Gas relay or repair with test · 360 m away
- 8219 Rayville DrMay 8, 2025Solar installation with battery · 364 m away