628 Odeneal St
Dallas, TX 75217
Gas repiping permitted at 628 Odeneal St
A residential plumbing permit indicates a complete gas repipe of a home and its service at 628 Odeneal St. The City of Dallas permit was filed on April 20, 2026.
Summarized from City of Dallas records · updated Apr 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 20, 2026
- since Apr 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 628 Odeneal St
What work is planned at 628 Odeneal St?
A City of Dallas residential plumbing permit describes a complete gas repipe of the home and its service. It was filed April 20, 2026, under permit RES-PLM-26-004150.
When was the gas repiping permit filed?
The permit was filed on April 20, 2026. The record does not provide a completion date.
Is a new home being built at 628 Odeneal St?
The available record is for residential plumbing work: a complete gas repipe of a home and its service. It does not describe new home construction.
What is the Dallas permit number for 628 Odeneal St?
The permit number is RES-PLM-26-004150. It is listed as a residential plumbing permit filed April 20, 2026.
Does the permit include a project cost or square footage?
The City of Dallas record does not list a project valuation or square footage.
Also being built nearby
All of 75217- 610 Odeneal StJun 23, 2026New gas line: 50 ft to meter to house · 40 m away
- 665 Cedarcliff DrMay 28, 2026Gas test only · 82 m away
- 671 Cedarcliff DrJul 29, 2025Move panel to outside · 115 m away
- 8709 Buckeye DrAug 26, 2026Wire was stolen out of the meter base to riser. repairing and replacing wire that was stolen · 132 m away
- 8611 Elam Heights DrOct 1, 2025Gas test/meter release · 132 m away
- 8723 Buckeye DrMay 14, 2025Gas test · 150 m away
- 8731 Buckeye DrApr 3, 2026Proposed installation location and wire run:install 60a 240v breaker in main panel. route conductors in surface-mounted conduit vertically from panel to attic, across attic, and down front exterior wall via surface-mounted conduit. hardwire gm powerup 2 (gen 2) charger on front exterior wall in front of carport. the charger will be installed on a 60a circuit and will draw up to 48a continuous · 161 m away
- 508 Odeneal StMar 16, 2026Install new gas line for stove, air conditioning unit, and a water heater. new gas line to connect to city meter · 164 m away
- 620 Cedarcliff DrJan 29, 2026Removing drive approach of 9x12'replacing with a double wide approach 21x9'removing and replacing driveway section of 8x40 · 175 m away
- 8726 Odom DrMay 15, 20253ton base horizontal gas system · 185 m away
- 507 Blueberry BlvdJan 10, 2026Nsfaa garage to living room conversation, addition to existing structure · 194 m away
- 8745 Odom DrAug 25, 2025Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 201 m away