6821 Highspire Dr
Dallas, TX 75217
6821 Highspire Dr: 4 projects on record
City of Dallas lists 4 filings across 4 projects at 6821 Highspire Dr, Dallas, TX 75217 since October 14, 2020. The most recent, filed November 11, 2020, covers: “Replace or modify existing hvac”.
Compiled from City of Dallas records · updated Nov 11, 2020
- Projects
- 4
- 4 filings
- Latest filing
- Nov 11, 2020
- since Oct 14, 2020
- Largest scope
- —
- Listed value
- $12K
- partial · often understated
Permit & project history
4 projectsSources: City of Dallas
Questions about 6821 Highspire Dr
What is being built at 6821 Highspire Dr?
The latest filing (City of Dallas permit 2011113076, November 11, 2020) covers replace or modify existing hvac.
How many permits and filings does 6821 Highspire Dr have?
4 filings across 4 projects, from October 14, 2020 to November 11, 2020.
How much is the construction at 6821 Highspire Dr worth?
Permits at this address list about $12K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 6821 Highspire Dr?
Yes. Nearby filings include 6821 Seco Blvd (electrical repairs, Oct 4, 2020); 6734 Seco Blvd (gas test, May 26, 2026); 6721 Seco Blvd (install new hvac system, Sep 15, 2026).
How do I get alerts for new permits at 6821 Highspire Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75217- 6821 Seco BlvdOct 4, 2020Electrical repairs · 75 m away
- 6734 Seco BlvdMay 26, 2026Gas test · 129 m away
- 6721 Seco BlvdSep 15, 2026Install new hvac system · 139 m away
- 6709 Seco BlvdAug 26, 2025Gas line replacement · 155 m away
- 6703 Seco BlvdJan 25, 2026Mcr with battery we will be installing a 8.91kw add on system with a non back up tesla power wall 3 battery · 164 m away
- 1558 Gillette CirApr 14, 2026Excavate trenching in the yard to install a new gas service line, including a dedicated shut-off (gate valve) at the point of entryinstall new gas piping throughout the homecomplete partial water re-pipe beneath the home · 176 m away
- 1522 Gillette CirJun 23, 2026Full roof replacement 30 years asphalt shingles will be installedall roof components will be replacedsynthetic felt, flashing, vents and painting pipes as neededall work will be performed in compliance with applicable building codes and manufacturer specifications · 189 m away
- 1507 Gillette StOct 6, 2025Nsfaa-1507 gillette st - sfd 746 sq ft addition · 206 m away
- 1511 Devon CirOct 26, 2020Solar panel installation of a 7.920kw systen dc and main panel upgrade · 262 m away
- 1447 Gillette StAug 29, 2025Gas test w repairs · 285 m away
- 1450 Gillette StJan 20, 2026Gas pressure test · 290 m away
- 1723 Eastcliff DrDec 10, 2020Replace water heater & replace/test gas service · 299 m away