725 N Jim Miller Rd
Dallas, TX 75217
Plumbing repairs permitted at 725 N Jim Miller Rd
City of Dallas permits indicate plumbing repairs at 725 N Jim Miller Rd, not a new building. The permits, filed May 15 and September 19, 2025, cover replacement of a water line and backflow equipment.
Summarized from City of Dallas records · updated Sep 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 19, 2025
- since May 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 725 N Jim Miller Rd
What is happening at 725 N Jim Miller Rd in Dallas?
City permits indicate plumbing work, including replacement of a water line and backflow equipment. The records do not describe a new building.
What was permitted at 725 N Jim Miller Rd?
A May 15, 2025, commercial plumbing permit (COM-PLM-25-000085) covers replacing a 1½-inch RPZ valve and about 10 feet of copper water line. A September 19 permit (COM-PLM-25-001844) records a backflow replacement.
Is a new building being built at 725 N Jim Miller Rd?
The available City of Dallas records describe plumbing work, not construction of a new building.
When were permits filed for 725 N Jim Miller Rd?
The two listed permits were filed May 15 and September 19, 2025.
What plumbing work is planned at 725 N Jim Miller Rd?
The records describe replacing a 1½-inch RPZ valve, about 10 feet of copper water line, and backflow equipment. They do not provide a project schedule.
How much will the work at 725 N Jim Miller Rd cost?
The records provide no reported valuation or project cost.
Also being built nearby
All of 75217- 7044 Hodde StJul 29, 2026Lights and canopy addition · 106 m away
- 7044 Hodde Street · Dallas Independent School DistrictJan 25, 2024E.b. comstock middle school renovation — renovation/alteration — interior renovation of existing public middle school (grades 6-8). this includes roof replacement, window replacement and elevator replacement, as well as, the addition of a new walkway canopy over an existing concrete sidewalk, and existing concrete · 106 m away
- 7331 C F Hawn FwyMay 19, 2026New 200a 120/240v service to supply power to verizon ground equipment · 165 m away
- 620 N Jim Miller RdMay 14, 2026Addition of 2 mini split systems · 200 m away
- 7505 C F Hawn FwyDec 19, 2025Construction for new tiger express corner store · 206 m away
- 6923 Hodde StJan 7, 2021Gas test · 236 m away
- 540 N Jim Miller RdJun 27, 2025200 amp service upgrade · 256 m away
- 6839 Lucy StMar 16, 2026Install of ground mounted solar panels · 278 m away
- 6969 C F Hawn FwySep 17, 2020Gas relay or repair with test · 306 m away
- 6811 Hillmont DrOct 24, 2020Interior/exterior remodel and garage conversion · 322 m away
- 622 Woodmont DrDec 1, 2025Gas test for release · 340 m away
- 609 Woodmont DrNov 25, 2020Remodel existing plumbing · 358 m away