8008 Elam Rd
Dallas, TX 75217
New swimming pool and shade structure at 8008 Elam Rd
A new swimming pool and shade structure are planned at 8008 Elam Rd, according to a City of Dallas pool permit filed March 30, 2026. City permits filed July 20–22, 2026, also cover pool plumbing and electrical work.
Summarized from City of Dallas records · updated Jul 22, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jul 22, 2026
- since Mar 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 8008 Elam Rd
What is being built at 8008 Elam Rd in Dallas?
A City of Dallas permit describes a new swimming pool and shade structure. It was filed March 30, 2026, under permit COM-POOL-25-000034.
Is there a new pool planned at 8008 Elam Rd?
Yes. The City of Dallas issued a commercial pool permit for a new swimming pool and shade structure, filed March 30, 2026.
What are the recent permits for 8008 Elam Rd?
The City of Dallas filed a pool plumbing permit on July 20, 2026, and electrical permits on July 21 and 22. The records describe work for a pool.
When was the pool permit filed for 8008 Elam Rd?
The pool permit was filed March 30, 2026. Its description is “New swimming pool and shade structure,” and its permit number is COM-POOL-25-000034.
What electrical work is permitted at 8008 Elam Rd?
Two City of Dallas commercial electrical permits were filed July 21 and 22, 2026. Their descriptions refer to electrical work on a pool.
What plumbing work is permitted at 8008 Elam Rd?
A City of Dallas commercial plumbing permit filed July 20, 2026, describes installing a backflow device for the pool filler and a boiler drain for a water hose.
Also being built nearby
All of 75217- 8008 Elam Road · Palladium Buckner Station, Ltd.Apr 15, 2025Palladium buckner station — new construction — new construction of 304-unit multi-family apartment community
- 410 Hillburn DrDec 24, 2025Wooden pallets are stored outdoors in designated areas while awaiting repair or shipping. the pallets are stacked securely in uniform piles, with each stack reaching a maximum height of approximately 17 feet. the storage area is organized to allow safe access for forklifts and personnel, and all stacks are maintained in a stable condition to minimize risk of collapse or fire hazard. the outdoor storage area is monitored regularly to ensure compliance with safety and municipal regulation · 128 m away
- 7830 Rilla AveFeb 4, 2026System replacement · 145 m away
- 7943 Rilla AveAug 19, 2026The installation includes 33 q.peak duo blk ml-g10.c+ 410 pvmodules, 1 solaredge use11400h-usskbez8, and safetyequipment · 203 m away
- 7926 Rilla AveMay 4, 2026Upgrade service · 221 m away
- 7822 Dasch StDec 26, 2025Gas test · 245 m away
- 7832 Dasch StNov 13, 2026It is recommended that seventeen (17) pad and block, sill plate, beam, and joist be installed as indicated on the figure(s) attached to this report. in addition, it is recommended that the floor be re-leveled, and any existing internal supports be re-shimmed with steel shims · 246 m away
- 7809 Dasch StJun 25, 2025Service fell off the residential home due to bad weather we are on site fixing the electrical and upgrading panel · 256 m away
- 7823 Dasch StOct 26, 2020Install solar panels on an existing, residential roof · 257 m away
- 7907 Wes Hodges RdDec 17, 2025Replace gas line · 263 m away
- 7706 Rilla AveJun 12, 2026Repair gas leak · 266 m away
- 7923 Wes Hodges RdDec 29, 2020Gas relay or repair with test · 277 m away
More pools in 75217.