8360 Teresa Ln
Dallas, TX 75217
Gas line installation permitted at 8360 Teresa Ln
A residential plumbing permit filed November 6, 2026, covers installing a 1-inch gas line from the house to the meter, code upgrades and a whole-house gas pressure test. An earlier gas test permit was filed July 17, 2026.
Summarized from City of Dallas records · updated Nov 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 6, 2026
- since Jul 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8360 Teresa Ln
What work is permitted at 8360 Teresa Ln?
The November 6, 2026, residential plumbing permit covers installing a 1-inch gas line from the house to the meter, code upgrades and a whole-house gas pressure test.
Is a new home being built at 8360 Teresa Ln?
The records provided do not show a new-home project. They show residential plumbing permits for gas testing and gas line work.
When was the gas line permit filed at 8360 Teresa Ln?
The permit was filed November 6, 2026. Its number is RES-PLM-26-012023.
Was there an earlier permit for gas work at this address?
Yes. A residential plumbing permit for a gas test was filed July 17, 2026, under permit number RES-PLM-26-007418.
What size gas line is being installed at 8360 Teresa Ln?
The November 6, 2026, permit description specifies a 1-inch gas line running from the house to the meter.
Does the permit list a project cost or completion date?
The records provided do not list a project cost or completion date.
Also being built nearby
All of 75217- 8364 Teresa LnMar 9, 2026Oncor service · 10 m away
- 8411 Rayville DrJul 8, 2026Install new yard gas main line from meter to the house 20 ft yard line · 81 m away
- 650 Holcomb Rd · Dallas ISDMar 26, 2026Pole lights · 104 m away
- 639 Holcomb RdApr 9, 2026Saw cut and remove existing curb and gutter. excavate the area approximately 6 inches to grade for a new concrete approach entrance. install #3 rebar at 18 inches on center · 108 m away
- 659 Holcomb RdJun 30, 2025Install mechanical for new construction. install a 3.5 ton hvac unit · 128 m away
- 614 Holcomb RdJun 4, 2025Electrical service upgrade stand alone · 135 m away
- 523 Holcomb RdSep 17, 2026Meter base repair · 185 m away
- 8308 Rayville DrJul 18, 2026Replace gas lines inside house. (1) furnace, (1) water heater, & (2) stove · 262 m away
- 8433 Old Homestead DrAug 28, 2026Rerooof certainteed landmark 30 year warranty · 265 m away
- 8418 Elam RdJul 27, 2026Gas line replacement · 291 m away
- 705 Manhattan DrJan 9, 2026Plumbing gas re pipe 60ft to new location set by atmos energy · 295 m away
- 533 Ravenwood DrSep 1, 2026Remodel · 304 m away