Recent · latest filing Feb 2026Residential
8519 Torreon St
Dallas, TX 75217
New home permit filed at 8519 Torreon St
A City of Dallas permit record lists new construction of a residential home at 8519 Torreon St. The permit was filed on February 6, 2026, and its description notes that a final plat is needed.
Summarized from City of Dallas records · updated Feb 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 6, 2026
- since Feb 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8519 Torreon St
What is being built at 8519 Torreon St in Dallas?
A City of Dallas permit record describes new construction of a residential home at the address.
When was the permit for 8519 Torreon St filed?
The permit was filed on February 6, 2026.
What is the permit number for 8519 Torreon St?
The City of Dallas permit number is RES-NEW-26-000163.
Does the 8519 Torreon St permit mention a plat?
Yes. The permit description says a final plat is needed.
How big will the home at 8519 Torreon St be?
The permit record does not list the home's square footage.
What is the estimated cost of the home at 8519 Torreon St?
The permit record does not provide a project cost estimate.
Also being built nearby
All of 75217- 8553 Torreon StOct 28, 2020Installation of photovoltaic solar panels on roof of home · 19 m away
- 8520 Torreon StJul 17, 2026Outdoor breaker enclosure · 55 m away
- 8523 Cardella AveSep 21, 2020Remove existing roof and install new roof · 113 m away
- 8610 Cardella AveJan 13, 2021Install water heater · 117 m away
- 8638 Torreon StNov 4, 2020Install roof mounted solar pv panels · 117 m away
- 1032 Holcomb RdMar 4, 2026Replace drive approach and city walk · 135 m away
- 1011 Boquillas CtDec 17, 2025Solar installation res-solar-25-000497 · 143 m away
- 8650 Torreon StJun 27, 2025Company will remove existing shingles and black papercompany will inspect the deck for damage ( up to 10% is covered)company will install new synthetic waterproof covercompany will install new 30y shingles approx 22bigcompany will clean up and haul away the debris · 160 m away
- 8621 Files StJun 26, 2026Service upgrade due to service conductors damaged rubbing at old location · 195 m away
- 942 Holcomb RdAug 26, 2026Plumbing associated with permit #2412111041_194659914-002 · 203 m away
- 936 Holcomb RdAug 18, 2026New hvac system, copper lines , ducts , boots, gas lines · 210 m away
- 8516 Files StAug 29, 2025Need inspection for gas to be turned on in the home before september the 1st · 222 m away