9202 Elam Rd
Dallas, TX 75217
New domestic water line at 9202 Elam Road
A City of Dallas commercial plumbing permit filed August 10, 2026, covers a new 2-inch domestic water line from the building to a garden area at 9202 Elam Road. The record does not provide a project valuation or square footage.
Summarized from City of Dallas records · updated Aug 10, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 10, 2026
- since Dec 28, 2020
- Largest scope
- —
- Listed value
- $146K
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 9202 Elam Rd
What is being built at 9202 Elam Road in Dallas?
A City of Dallas permit covers installation of a new 2-inch domestic water line from the building to a garden area. The filing does not describe other construction.
When was the permit filed for 9202 Elam Road?
The permit was filed on August 10, 2026.
What is the permit number for work at 9202 Elam Road?
The permit number is COM-PLM-26-003005. It is listed as a commercial plumbing permit filed August 10, 2026.
What is the scope of the plumbing work at 9202 Elam Road?
The permit describes installing a new 2-inch domestic water line from the building to a garden area.
What is being built near Harbor Of Hope on Elam Road?
At 9202 Elam Road, 32 meters from Harbor Of Hope at 9209 Elam Road, a permit covers a new 2-inch domestic water line to a garden area. Separate records for 9209 Elam Road describe a 41-unit permanent supportive housing project.
Also being built nearby
All of 75217- 9209 Elam RdJul 10, 2026Qteam meeting 8.18.26 (9 am) - 3-story, type v-a new construction, 41 units permanent supportive housing multifamily., with associated surface parking · 32 m away
- 9209 Elam Road · Dallas County Mental Health & Mental Retardation CenterJun 30, 2026Harbor of hope — new construction — new construction, 41-unit permanent supportive multifamily housing with associated common spaces and parking. total of 55,561 sq ft · 32 m away
- 9217 Elam RdNov 10, 2026The scope of work consists of reusing the existing 14'-0" x 16'-0" concrete pad and extending it to 14'-0" x 22'-0". the project includes the installation of one 12'-0" h-frame, two span panels, four tesla powerwall 3 units, two tesla gateway 3 units, one charles fiber box (cube-m01818wb-a), one 200a meter in the existing meter box, one new single meter box on the existing utility h-frame, one 200a meter in the proposed meter box, four nodes, and one ground bar. additional work includes installing conduit runs from the h-frame to the nodes and installing fiber handholes, with the final quantity of handholes to be determined by the contractor · 43 m away
- 9330 Elam RdApr 15, 2026Nsfaa-duplex 9330/9328 elam property was rezoned to duplex on march 25, 2026 (please see ordinance 33357) · 192 m away
- 9321 Cuba DrSep 4, 2025Reroof, shingles · 235 m away
- 446 N Prairie Creek RdNov 18, 2026Gas test · 243 m away
- 9227 Marvel DrMar 2, 2026Re-roof · 256 m away
- 355 Vista CtDec 9, 2020Remodel existing plumbing · 265 m away
- 555 Sunburst DrDec 30, 2020Gas test · 266 m away
- 606 Edgeglen DrAug 18, 2025Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 281 m away
- 400 N Prairie Creek RdNov 3, 2026Repulled new neutral wire from meter to weatherhead · 298 m away
- 333 Vista CtJul 23, 2026Gas test · 301 m away