9820 Mill Valley Ln

Dallas, TX 75217

Rooftop solar and battery system permitted at 9820 Mill Valley Ln

City of Dallas permits filed July 8 and 9, 2026, indicate a residential electrical service upgrade and a rooftop solar installation with battery storage at 9820 Mill Valley Ln. The solar permit describes 27 modules rated at 11.07 kW DC, a 15 kW AC inverter, and 40 kWh of battery storage.

Summarized from City of Dallas records · updated Jul 9, 2026

Projects
2
2 filings
Latest filing
Jul 9, 2026
since Jul 8, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Mcr with battery photovoltaic roof mount system27 modules-roof mounted - 11.070 kw dc, 15.000 kw ac27 american made power solution:amps-410p-54bb 410w pv modules with12 duracell: d600-m2a-240amicroinverters03 duracell: d350-m1a-240amicroinverters01 duracell power center maxhybrid 15 inverter and 08 duracelldura5 dc-coupled batteries [40 kwh]

    Mcr with battery photovoltaic roof mount system27 modules-roof mounted - 11.070 kw dc, 15.000 kw ac27 american made power solution:amps-410p-54bb 410w pv modules with12 duracell: d600-m2a-240amicroinverters03 duracell: d350-m1a-240amicroinverters01 duracell power center maxhybrid 15 inverter and 08 duracelldura5 dc-coupled batteries [40 kwh]

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-26-000338
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Meter/mast upgrademain service panel upgrade

    Meter/mast upgrademain service panel upgrade

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-004006
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 9820 Mill Valley Ln

What is being installed at 9820 Mill Valley Ln?

City of Dallas records indicate a rooftop solar system with battery storage and an electrical service upgrade. The solar permit, RES-SOLAR-26-000338, was filed July 9, 2026.

When was the solar permit filed at 9820 Mill Valley Ln?

The City of Dallas filed residential solar permit RES-SOLAR-26-000338 on July 9, 2026.

How large is the solar system at 9820 Mill Valley Ln?

The July 9, 2026 permit describes 27 roof-mounted modules with a capacity of 11.07 kW DC and a 15 kW AC inverter.

Is battery storage included at 9820 Mill Valley Ln?

Yes. The solar permit describes 40 kWh of battery storage.

What electrical work is permitted at 9820 Mill Valley Ln?

A residential electrical permit filed July 8, 2026, covers a meter and mast upgrade and a main service panel upgrade. The permit number is RES-ELC-26-004006.

Is there solar work near Reserve At Augustine?

A rooftop solar and battery installation is permitted at 9820 Mill Valley Ln, about 306 meters from Reserve At Augustine. The City of Dallas filed the solar permit on July 9, 2026.