10311 Baronne Cir
Dallas, TX 75218
Water heater and pressure-reducing valve replacement permitted
A residential plumbing permit filed May 26, 2026, covers replacing the pressure-reducing valve and gas water heater at 10311 Baronne Cir. The City of Dallas record does not describe new construction.
Summarized from City of Dallas records · updated May 26, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 26, 2026
- since May 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10311 Baronne Cir
What work is planned at 10311 Baronne Cir?
A City of Dallas residential plumbing permit covers replacing the pressure-reducing valve and gas water heater. The permit was filed May 26, 2026.
Is a new home being built at 10311 Baronne Cir?
The available record describes plumbing replacements, not new home construction. It was filed as a residential plumbing permit.
When was the plumbing permit filed for 10311 Baronne Cir?
The permit was filed May 26, 2026.
What is the permit number for work at 10311 Baronne Cir?
The permit number is RES-PLM-26-005392. It covers replacement of the pressure-reducing valve and gas water heater.
What is being replaced near Northwest Regional Airport?
At 10311 Baronne Cir, the permit record lists a pressure-reducing valve and gas water heater for replacement. Northwest Regional Airport is listed 152 meters away.
Also being built nearby
All of 75218- 202 Bon Aire DrJan 5, 2021Electrical remodel · 14 m away
- 211 Bon Aire DrDec 16, 2020Replace or modify existing hvac · 26 m away
- 217 Bon Aire DrNov 14, 2025Replace 3 ton furn only · 31 m away
- 169 Bon Aire DrFeb 24, 2026Replace federal pacific panel and install a 200-amp meter base and electrical panel · 51 m away
- 155 Bon Aire DrOct 6, 2026Replace building under house under pier and beam repair sewer in yard · 73 m away
- 10320 Baronne CirOct 27, 20264 ton gas full system replacement · 82 m away
- 131 Bon Aire DrFeb 27, 2026Remove old composition shingles & install new composition shingles · 112 m away
- 10347 Baronne CirMay 12, 2025Replace water line from meter to house · 116 m away
- 307 Bon Aire DrNov 11, 2020Upgrade existing electrical service · 129 m away
- 315 Bon Aire DrSep 5, 2026Carport · 138 m away
- 10518 Solta DrOct 2, 2020Upgrade existing electrical service · 140 m away
- 319 Bon Aire DrFeb 11, 2026Sewer relay · 142 m away