10753 Sinclair Ave
Dallas, TX 75218
10753 Sinclair Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 10753 Sinclair Ave, Dallas, TX 75218. The most recent, filed June 16, 2025, covers: “Gas pressure test”.
Compiled from City of Dallas records · updated Jun 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 16, 2025
- since Jun 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10753 Sinclair Ave
What is being built at 10753 Sinclair Ave?
The latest filing (City of Dallas permit RES-PLM-25-001493, June 16, 2025) covers gas pressure test.
How many permits and filings does 10753 Sinclair Ave have?
1 filing across 1 project, from June 16, 2025 to June 16, 2025.
Is there other construction near 10753 Sinclair Ave?
Yes. Nearby filings include 10745 Sinclair Ave (• homeowner to coordinate with oncor for 8:00 am disconnect.• remove existing service riser, meter base, conduit and electrical panel.• install and provide new service riser conduit, weather head and wire to new meter base.• install and provide new conduit and wire from new meter base to service to disconnectand from service disconnect to new 200 amp electrical panel.• all existing wiring in existing panel to be reused and rewired in new electrical panel.• install new ground rod and ground new electrical service and existing service at main gasline and cold water located in workshop.• label all new electrical panel and all breakers.• energize circuits and verify everything is working properly, Jan 9, 2026); 11614 Rogue Way (residential re-roof, Feb 23, 2026); 11620 Rogue Way (gas repair, Oct 9, 2026).
How do I get alerts for new permits at 10753 Sinclair Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 10745 Sinclair AveJan 9, 2026• homeowner to coordinate with oncor for 8:00 am disconnect.• remove existing service riser, meter base, conduit and electrical panel.• install and provide new service riser conduit, weather head and wire to new meter base.• install and provide new conduit and wire from new meter base to service to disconnectand from service disconnect to new 200 amp electrical panel.• all existing wiring in existing panel to be reused and rewired in new electrical panel.• install new ground rod and ground new electrical service and existing service at main gasline and cold water located in workshop.• label all new electrical panel and all breakers.• energize circuits and verify everything is working properly · 10 m away
- 11614 Rogue WayFeb 23, 2026Residential re-roof · 68 m away
- 11620 Rogue WayOct 9, 2026Gas repair · 71 m away
- 11635 Rogue WayDec 9, 2025Gas test · 74 m away
- 11632 Rogue WayJun 17, 2026Tear off existing shingles and replace with owens corning duration storm in brownwood · 82 m away
- 11618 Cimarec StOct 21, 2026Install 50 gallon gas water heater (swap out) · 84 m away
- 11647 Rogue WayMay 27, 2025Riddell plumbing will run a gas line over about 10ft to get port near electrical box · 92 m away
- 11634 Cimarec StNov 10, 2025Gas relay replacement · 109 m away
- 10418 Maplegrove LnMar 8, 2026Repair meter base · 113 m away
- 10832 Creekmere DrSep 23, 2026Add new sub panel a connect 2 pool pomp · 115 m away
- 11638 Cimarec StAug 12, 2026We will replace main gas sign from the meter going to the home on the left side of the home rerouting it. we will also put new gas lines for tankless unit in the attic furnace in the attic and stove in the kitchen · 115 m away
- 10415 Maplegrove LnOct 14, 2025Replacing the gas line from the meter up to the home · 141 m away