Recent · latest filing Jul 2026Residential
10868 Caprock Cir
Dallas, TX 75218
Residential solar installation with 24 panels and two batteries
A residential solar installation with 24 panels and two batteries was permitted at 10868 Caprock Cir. The City of Dallas permit was filed on July 20, 2026.
Summarized from City of Dallas records · updated Jul 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 20, 2026
- since Jul 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10868 Caprock Cir
What is being built at 10868 Caprock Cir?
A City of Dallas permit indicates a residential solar installation with 24 panels and two batteries.
How many solar panels and batteries are planned at 10868 Caprock Cir?
The permit describes an installation with 24 solar panels and two batteries.
When was the solar permit filed for 10868 Caprock Cir?
The City of Dallas filed permit RES-SOLAR-26-000258 on July 20, 2026.
Is the project at 10868 Caprock Cir residential?
Yes. The City of Dallas record classifies it as a residential solar/PV permit.
How much will the solar installation at 10868 Caprock Cir cost?
The permit record does not list a project valuation or estimated cost.
Also being built nearby
All of 75218- 10862 Caprock CirAug 18, 2025Replacing with new gas line for a meter to the house gas line for furnace and water heater tankless with h install · 26 m away
- 10852 Caprock CirJul 24, 2026Gas repipe · 68 m away
- 10851 Caprock CirJul 23, 2026Gas repipe · 78 m away
- 10888 Caprock CirJul 8, 2025Update electrical panel and relocate to outsideupdate service to 200 amps · 83 m away
- 10848 Caprock CirJul 30, 2026Gas plumbing · 85 m away
- 10821 Clearbrook LnOct 27, 2025Replace new gas system · 89 m away
- 10847 Caprock CirJul 14, 2026Install goodman 4 ton 17.2 seer complete gas system, r-32 refrigerant - horiz · 94 m away
- 10866 Colbert WayJul 16, 2025Electrical for addition/alteration · 98 m away
- 10850 Colbert WayApr 13, 2026Full under pier & beam sewer pipe replacementexcavation to, re-route / replace (front bathroom, backbathroom, kitchen & washer line under home sewer pipes only) ofthe plumbing sewer drainpipe under the home only. our planreroutes the under-slab/home sewer pipe and connects it back intothe yard sewer line at the city tap area , effectively replacing the yardsewer line as well · 119 m away
- 10914 Colbert WaySep 29, 2026Sewer relay · 144 m away
- 10841 Colbert WayJul 3, 2025Sewer line repipe under peir and beam home · 147 m away
- 10830 Colbert WayJan 8, 2026Run a new gas line for a 26kw generator in a 20' trench from just inside the gate to the gas meter · 159 m away
More solar installs in 75218.