Recent · latest filing Feb 2026Residential
11316 Lippitt Ave
Dallas, TX 75218
Tankless water heater change-out permitted at Dallas home
A residential plumbing permit records a tankless water heater change-out in a closet at 11316 Lippitt Ave. The City of Dallas permit was filed February 13, 2026.
Summarized from City of Dallas records · updated Feb 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 13, 2026
- since Feb 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 11316 Lippitt Ave
What is being built at 11316 Lippitt Ave?
The permit records a tankless water heater change-out in a closet, not a new building project.
What work was permitted at 11316 Lippitt Ave?
A residential plumbing permit covers a tankless water heater change-out in a closet.
When was the water heater permit filed?
The City of Dallas filing date is February 13, 2026.
What is the permit number for 11316 Lippitt Ave?
The permit number is RES-PLM-26-001716.
Is a new home being built at 11316 Lippitt Ave?
The record provided is for a residential plumbing permit covering a tankless water heater change-out; it does not describe new home construction.
Also being built nearby
All of 75218- 11307 Lippitt AveOct 20, 2020Replace or modify existing hvac · 41 m away
- 11335 Lippitt AveMay 20, 2026Demolition existing roof and felt, install new felt, rain barrier shingles and drip edge · 71 m away
- 11316 Rupley LnJul 23, 2026Replace 5 ton gas hvac unit · 94 m away
- 11303 Rupley LnJun 22, 2026Removal of 30-year shingles and install 7/16" decking over existing 3/8" decking an install new 30-year shingles · 99 m away
- 11312 Lanewood CirAug 28, 2025Installation of pv solar system · 99 m away
- 11304 Rupley LnFeb 2, 2026Gas test · 106 m away
- 11323 Lanewood CirMar 18, 2026Full under slab sewer pipe replacementexcavation to, re-route / replace (hall bathroom, masterbathroom, kitchen & washer line under home sewer pipes only) ofthe plumbing sewer drainpipe under the home only. our planreroutes the under-slab/home sewer pipe and connects it back intothe yard sewer line at the city tap area , effectively replacing the yardsewer line as well · 113 m away
- 11332 Lanewood CirAug 18, 2025Replace existing hvac system · 115 m away
- 11327 Lanewood CirNov 11, 2020Addition to sfd · 117 m away
- 11343 Rupley LnJul 28, 2025Install new electrical service which includes meter base, electrical panel, mast, weatherhead, mains wire, etc · 129 m away
- 11335 Lanewood CirMay 27, 2026Replacing 50 gallon gas water heater in the closet · 130 m away
- 11355 Lippitt AveOct 1, 2020Install water heater · 147 m away