12130 Midlake Dr
Dallas, TX 75218
Plumbing repairs permitted at 12130 Midlake Dr
City of Dallas permits indicate plumbing repairs at the residential property, including replacement of underfloor sewer piping and rerouting water lines to fixtures. The sewer work was permitted September 8, 2025, and the water-line work September 22, 2025.
Summarized from City of Dallas records · updated Sep 22, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 22, 2025
- since Sep 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsArriaga plumbing llc will provide the necessary labor, materials, equipment and permit to perform the following scope of work:replace all underfloor cast iron sanitary sewer piping and replace existing sanitary sewer piping from house to sidewalk.* provide a permit through the city of dallas for work.* provide excavations for three (3) access holes on exterior of house. one access hole will be through driveway outside bathroom. a 4'x4' section of concrete will be sawcut, removed and repoured after backfill.* provide excavations for approximately 110 feet of tunnel under house and 45 feet of trench to expose all the underfloor and subgrade sanitary sewer piping.* replace all exposed cast iron sanitary sewer piping with new schedule 40 pvc pipe and fittings with code approved methods. all underfloor sewer piping shall be supported from underside of concrete.new double clean outs will be installed in front of house and new sewer piping will terminate at city sewer connection. all underfloor cast iron piping shall be cut directly under concrete slab and transitioned to pvc. the lead bends on all three (3) toilets shall be replaced through the floor with new pvc and flanges. (this is the only above floor work in this scope of work.)the sanitary sewer piping replacement covers new underfloor sewer piping to all fixtures in the house; total of three bathrooms (one toilet, one tub/shower, and one lavatory in each bathroom) one kitchen sink, one coffee bar sink, and one laundry.* test all new piping via hydrostatic testing. * have work inspected by the city of dallas building inspections.* back fill all excavations and repour concrete after all work is completed and approved by the city of dallas.** five year limited warranty on work performed. warranty does not cover any issues due to ground shifting or foundation movement.*** arriaga plumbing llc assumes no liability for any structural or foundation issues either existing or future.*** if bedrock is encountered during excavations, extra charges may be necessary and will be discussed at that time, if needed.*** all work is below floor/grade. there is no work above floor in this scope of work except for the removal and resetting of toilets. any existing sewer piping that is needed to be replaced through the floor will require an additional scope of work and will be discussed at that time, if necessary.*** while care will be taken, there are no guarantees for survival of any sod or landscaping removed and replanted during excavations
Arriaga plumbing llc will provide the necessary labor, materials, equipment and permit to perform the following scope of work:replace all underfloor cast iron sanitary sewer piping and replace existing sanitary sewer piping from house to sidewalk.* provide a permit through the city of dallas for work.* provide excavations for three (3) access holes on exterior of house. one access hole will be through driveway outside bathroom. a 4'x4' section of concrete will be sawcut, removed and repoured after backfill.* provide excavations for approximately 110 feet of tunnel under house and 45 feet of trench to expose all the underfloor and subgrade sanitary sewer piping.* replace all exposed cast iron sanitary sewer piping with new schedule 40 pvc pipe and fittings with code approved methods. all underfloor sewer piping shall be supported from underside of concrete.new double clean outs will be installed in front of house and new sewer piping will terminate at city sewer connection. all underfloor cast iron piping shall be cut directly under concrete slab and transitioned to pvc. the lead bends on all three (3) toilets shall be replaced through the floor with new pvc and flanges. (this is the only above floor work in this scope of work.)the sanitary sewer piping replacement covers new underfloor sewer piping to all fixtures in the house; total of three bathrooms (one toilet, one tub/shower, and one lavatory in each bathroom) one kitchen sink, one coffee bar sink, and one laundry.* test all new piping via hydrostatic testing. * have work inspected by the city of dallas building inspections.* back fill all excavations and repour concrete after all work is completed and approved by the city of dallas.** five year limited warranty on work performed. warranty does not cover any issues due to ground shifting or foundation movement.*** arriaga plumbing llc assumes no liability for any structural or foundation issues either existing or future.*** if bedrock is encountered during excavations, extra charges may be necessary and will be discussed at that time, if needed.*** all work is below floor/grade. there is no work above floor in this scope of work except for the removal and resetting of toilets. any existing sewer piping that is needed to be replaced through the floor will require an additional scope of work and will be discussed at that time, if necessary.*** while care will be taken, there are no guarantees for survival of any sod or landscaping removed and replanted during excavations
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 12130 Midlake Dr
What is being built at 12130 Midlake Dr?
The permits indicate plumbing repairs at a residence, not a new building. The work includes replacing underfloor sewer piping and rerouting water lines.
What work was permitted at 12130 Midlake Dr in Dallas?
A September 8, 2025 permit covers replacement of underfloor cast-iron sanitary sewer piping and the sewer line from the house to the sidewalk. A September 22 permit covers rerouting water lines to fixtures.
When was the sewer work at 12130 Midlake Dr permitted?
The City of Dallas issued permit RES-PLM-25-004562 on September 8, 2025, for sanitary sewer piping replacement.
What is permit RES-PLM-25-005210 for?
The September 22, 2025 City of Dallas permit describes rerouting water lines overhead to each fixture and providing a new yard service.
Is a restaurant opening at 12130 Midlake Dr?
The records provided do not indicate a restaurant opening. They show two residential plumbing permits filed in September 2025.
Also being built nearby
All of 75218- 12112 Midlake DrOct 21, 2026Nsfaa detached carport and minor electrical · 20 m away
- 11141 Carissa DrOct 6, 2026Full repipe · 86 m away
- 12138 Ridgelake DrApr 1, 2026Hvac change out – remove & replace 1 full system + attic installation · 109 m away
- 12035 Loch Ness DrJun 1, 2026Mcr in ground fiberglass pool 14x33 with 700 sq-ft of deckingall work subject to field inspector approval · 133 m away
- 12031 Loch Ness DrJul 22, 2026Reroof · 135 m away
- 12208 Coolmeadow LnJan 23, 2026Roof replacement · 138 m away
- 12011 Loch Ness DrJul 9, 2026Install 5 ton (gas) a/c system complete · 152 m away
- 12012 Loch Ness DrJun 22, 2026Sewer line yard service and water line replacement · 158 m away
- 12006 Loch Ness DrFeb 24, 2026Electrical service upgrade · 165 m away
- 11106 Shortmeadow LnAug 5, 2026150amp overhead panel upgrade · 170 m away
- 11118 Shortmeadow LnMar 13, 2026Water line replacement 40' trench uponor 24" deep replacing old double check install new 1" double check front yard · 171 m away
- 12008 Midlake DrJun 24, 2025Replace existing hvac system · 176 m away
More restaurants in 75218.