12319 Sunland St
Dallas, TX 75218
Residential gas line and electrical service work
City of Dallas permits show a gas line replacement at 12319 Sunland St, filed September 14, 2026, and an update to the 200-amp electrical service, filed September 29, 2025. The records describe residential utility work, not a new building.
Summarized from City of Dallas records · updated Sep 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 14, 2026
- since Sep 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 12319 Sunland St
What is being built at 12319 Sunland St?
The permits describe residential utility work: a gas line replacement and an electrical service update. They do not indicate a new building.
Was a new home permitted at 12319 Sunland St in Dallas?
The records provided do not show a new-home permit. They list a residential electrical permit and a residential plumbing permit.
What gas work is planned at 12319 Sunland St?
A City of Dallas permit describes a gas line replacement. It was filed September 14, 2026, under permit RES-PLM-26-009768.
What electrical work is happening at 12319 Sunland St?
A permit describes an update to the 200-amp electrical service. It was filed September 29, 2025, under permit RES-ELC-25-003427.
When were permits filed for 12319 Sunland St?
The electrical service permit was filed September 29, 2025, and the gas line replacement permit was filed September 14, 2026.
Also being built nearby
All of 75218- 12305 Sunland StSep 9, 2026Minor gas repair. gas meter locked. needs a pressure test · 13 m away
- 12407 Sunland StJun 15, 202650 gallon gas water heater in hallway closet · 79 m away
- 12412 Sunland StJul 22, 2026Roof-mounted photovoltaic (pv) solar system with mpu. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance · 86 m away
- 12304 Brookmeadow LnJun 3, 2025Replacing a 4 ton gas complete system · 89 m away
- 12418 Sunland StOct 30, 202540-gallon water heater · 91 m away
- 12303 Brookmeadow LnMay 12, 2026Sewer yard service and 1 bathroom repipe · 100 m away
- 12230 Brookmeadow LnApr 13, 2026Drain will be replaced from cast iron to pvc · 105 m away
- 11207 Carissa DrApr 20, 2026Replace 3 ton complete · 108 m away
- 12332 Brookmeadow LnOct 1, 2025Test gas line for re connection · 109 m away
- 11215 Carissa DrAug 13, 2025Gas test · 111 m away
- 12327 Brookmeadow LnOct 30, 2025Water line replacement in yard up to 50ft · 114 m away
- 11218 Carissa DrOct 5, 2026Replace 50 gal gas wh · 124 m away