12410 Jupiter Rd
Dallas, TX 75218
Leasing preparation and gas test at 12410 Jupiter Rd
Dallas permits at 12410 Jupiter Rd document temporary utilities for cleaning and showing the suite for lease, plus a gas test; they do not indicate new construction. The first listed permit was filed July 22, 2025, and the latest was filed April 15, 2026.
Summarized from City of Dallas records · updated Apr 15, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 15, 2026
- since Jul 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsElectric temporary utility release for cleaning and showing the suite for leasing. no construction, renovation, or physical work, including electrical, will be carried out under this permit
Electric temporary utility release for cleaning and showing the suite for leasing. no construction, renovation, or physical work, including electrical, will be carried out under this permit
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 12410 Jupiter Rd
What is being built at 12410 Jupiter Rd in Dallas?
The listed permits do not indicate that anything is being built. They document temporary utility releases for cleaning and showing the suite for lease, and a gas test.
Is there construction planned at 12410 Jupiter Rd?
The July 22, 2025 electrical permit explicitly says no construction, renovation, or physical work would be done under that permit. The records provided do not identify a construction project.
What are the permits for at 12410 Jupiter Rd?
A July 22, 2025 permit and a March 5, 2026 permit cover temporary electrical utility releases to clean and show the suite. A commercial plumbing permit filed April 15, 2026, is for a gas test.
Is the suite at 12410 Jupiter Rd for lease?
The July 22, 2025 permit describes cleaning and showing the suite for lease. A March 5, 2026 permit also refers to cleaning and showing the suite.
When was the latest permit filed for 12410 Jupiter Rd?
The latest listed permit was filed April 15, 2026. It is a commercial plumbing permit for a gas test, number COM-PLM-26-001385.
What does permit COM-ELC-25-000960 cover?
Filed July 22, 2025, the commercial electrical permit covers a temporary utility release to clean and show the suite for lease. It states that no construction, renovation, or physical work would be carried out under the permit.
Also being built nearby
All of 75218- 11411 E Northwest HwyOct 9, 2020Gas test · 37 m away
- 11411 E Northwest HwyNov 13, 2026Bu zo pl in reference to co-26-005156 and building code official meeting.minor interior alterations to accommodate the proposed change of occupancy. work includes converting an existing office into a new restroom, constructing limited interior partitions for storage and a decor staging area, and associated plumbing modifications.existing electrical and hvac systems will remain unchanged and are in working condition. no new electrical or hvac work is proposed. existing and proposed floor plans are attached for reference · 37 m away
- 11360 E Northwest HwyJul 8, 2026Requesting ability to place zipline dropbox at this location to enable drone delivery · 51 m away
- 11363 E Northwest HwyNov 6, 2025Needing a finish work permit/continuation permit. original permit number is 1809241135. original work performed-remove 3 ust's and assoc'd piping and install 2 new ust's and new piping. we are needing a · 60 m away
- 12412 Jupiter RdJan 19, 2021Gas test · 67 m away
- 12409 Jupiter RdDec 1, 2025Gas test · 75 m away
- 12402 Jupiter RdMay 19, 2025Electric temporary utility release for cleaning and showing the suite 12410 for lease · 76 m away
- 11333 E Northwest HwyJul 22, 2025Commercial roofing: tear off top layer only of existing membrane and replace with new layer of gaf 60 mil tpo mechanically attached over existing. remove and replace fascia · 77 m away
- 12406 Jupiter RdMar 4, 2026Electric temporary utility release for cleaning and showing the suite · 77 m away
- 11354 Carissa DrNov 9, 2026Install furnace only · 215 m away
- 11348 Carissa DrDec 9, 2025A/c full change out · 228 m away
- 11505 Abston LnNov 21, 202528 pillars will be installed: 7 interior and 21 exterior.concrete pillars method:the method used to repair the property is the “pressed pillar method” which consists of excavating around the wall of the house on the outside with the aim of applying concrete cylinders with a pressure machine to level the house as much as possible and according to the inspection tolerance · 233 m away