1445 San Saba Dr
Dallas, TX 75218
1445 San Saba Dr: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 1445 San Saba Dr, Dallas, TX 75218. The most recent, filed November 11, 2020, covers: “Install swimming pool and spa”.
Compiled from City of Dallas records · updated Nov 11, 2020
- Projects
- 3
- 3 filings
- Latest filing
- Nov 11, 2020
- since Nov 11, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 1445 San Saba Dr
What is being built at 1445 San Saba Dr?
The latest filing (City of Dallas permit 2011061138, November 11, 2020) covers install swimming pool and spa.
How many permits and filings does 1445 San Saba Dr have?
3 filings across 3 projects, from November 11, 2020 to November 11, 2020.
Is there other construction near 1445 San Saba Dr?
Yes. Nearby filings include 1440 San Saba Dr (install roof mounted solar panels, Oct 24, 2020); 1503 San Saba Dr (water heater replacement, Oct 20, 2025); 1450 Old Gate Ln (tunnel under the concrete slab to replace approximately 80 feet of sewer line, Oct 31, 2026).
How do I get alerts for new permits at 1445 San Saba Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 1440 San Saba DrOct 24, 2020Install roof mounted solar panels · 80 m away
- 1503 San Saba DrOct 20, 2025Water heater replacement · 115 m away
- 1450 Old Gate LnOct 31, 2026Tunnel under the concrete slab to replace approximately 80 feet of sewer line · 124 m away
- 1415 San Saba DrJun 17, 2025Installing mini split in an in home office room · 127 m away
- 9104 Diceman DrFeb 24, 20268 1/2' wood fence on steel posts · 187 m away
- 1606 Old Gate LnNov 17, 2025Nsfaa-restoration scope of work following collision damagethe work proposed is a restoration to repair structural and finish damage caused by a vehicle collision impacting the dwelling. the scope is confined to the interior spaces shown damaged on the plan (office, guest bath, and adjacent hall) and does not include any non-damage-related remodeling or additions.general structural & wall repair:demolition and removal of all damaged wall and door assemblies in the office and guest bath where impact occurred, as depicted by the framing details (e.g., around the door opening between the office and guest bath, and potentially framing related to w1-03 and w1-07 windows).re-framing and patching of damaged load-bearing or partition walls in the affected areas to meet code specifications.installation/reinstallation of windows w1-03 (office) and w1-07 (guest bath) if they were damaged or removed for access.office restoration (area: 201 sq ft):repair of damaged wall surfaces (e.g., drywall/plaster, tape, and finish).installation of new wood flooring to match existing or replace the entire area as required for a seamless repair.restoration of electrical components, including re-running/reconnecting wiring for any outlet or switch that was damaged or required relocation for framing repair (e.g., the planned floor outlet conduit connection).guest bath restoration (area: 75 sq ft):removal and replacement of damaged plumbing fixtures, tile, and wall finishes as necessary to restore the space to its pre-damage condition.installation of new tile flooring and associated wall patching/finishing.restoration of the plumbing and electrical systems within the room to full operational status.hall restoration (area: 63 sq ft):repair of any damaged wall finishes in the hall adjacent to the impact zone.installation of new wood flooring to match the restored office area.this scope is strictly limited to repairing the structure, systems, and finishes damaged by the collision to return the structure to its pre-loss condition · 190 m away
- 1614 Old Gate LnJun 30, 2025Wire pool equipment · 192 m away
- 1618 Old Gate LnJan 30, 2026Install new hvac · 193 m away
- 1505 El Campo DrApr 27, 2026Remove existing driveway and replace new driveway with 18x10 drive approach · 193 m away
- 1622 Old Gate LnDec 29, 2025New drive approach · 194 m away
- 1511 San Saba DrJun 3, 2025Tunnel up to 10' sewer repair · 197 m away
- 1509 El Campo DrNov 13, 2026Electrical contractor change for the detached dwelling at 1509 el campo dr. under permit res-alt-add-26-000872. nmj electric is taking over after the electrical rough-in inspection. the previous electrical contractor performed the existing rough-in.remaining work includes installing dedicated hvac and water heater circuits, installing a 200-amp panel in the detached dwelling, and completing receptacle trim-out. upgrade the existing meter service to 320 amps continuous (400-amp class), install a second 200-amp disconnect for the detached dwelling, and install an underground feeder from the new disconnect to the dwelling panel, including trenching, conduit, wiring, and backfill. modify the existing generac generator conduit and wiring to accommodate moving the generator approximately 2 feet for clearance at the new disconnect. test the completed work and coordinate the remaining electrical inspections · 207 m away