1530 N Buckner Blvd
Dallas, TX 75218
Pool, spa and generator work permitted at 1530 N Buckner Blvd
City of Dallas permits indicate a gunite pool and spa, pool wiring, a pool-heater gas line, and a 22-kW generator installation at 1530 N Buckner Blvd. The permits were filed from June 30 through July 15, 2026.
Summarized from City of Dallas records · updated Jul 15, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jul 15, 2026
- since Jun 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 1530 N Buckner Blvd
What is being built at 1530 N Buckner Blvd?
City of Dallas permits indicate construction of a gunite pool and spa, along with wiring and a gas line for the pool heater. Permits also cover installation of a 22-kW generator.
When were permits filed for the pool at 1530 N Buckner Blvd?
The pool/spa permit, RES-POOL-26-000351, was filed July 14, 2026. Pool wiring was permitted the same day under RES-ELC-26-004151, and a gas line for the pool heater was permitted July 15 under RES-PLM-26-007283.
Is a generator being installed at 1530 N Buckner Blvd?
City permits filed June 30, 2026 indicate installation of a 22-kW generator and a 200-amp automatic transfer switch. The electrical permit is RES-ELC-26-003827.
What does permit RES-PLM-26-006733 cover?
The City of Dallas plumbing permit, filed June 30, 2026, describes a 22-kW generator installation tied into natural gas.
Are the permits for a commercial pool or retail project at 1530 N Buckner Blvd?
The records describe residential pool and spa work and a generator installation. They do not identify a commercial pool or retail project.
Also being built nearby
All of 75218- 1527 N Buckner BlvdOct 2, 2026Replace gas stops and gas test · 31 m away
- 1545 N Buckner BlvdDec 12, 2025Installing a new gas line to a generator · 63 m away
- 1511 N Buckner BlvdFeb 26, 2026Nsfaa build a 20x20 shed for storage · 73 m away
- 1508 N Buckner BlvdOct 21, 2025Gas line repipe · 78 m away
- 9527 Alta Mira DrNov 18, 2025Wreck and haul off debris from residential strcuture. scrape lot smooth for positive drainage · 201 m away
- 9425 Hermosa DrJul 27, 2026Remove and replace a concrete approach 22ft x 20ftinstall and cover new plastic pipe 18in wide x 20ft longrebar #3 16in on center3500 psiflex base compacter · 214 m away
- 9517 Hermosa DrMar 23, 2026Remove old composition shingles & install new composition shingles · 214 m away
- 9510 Alta Mira DrMar 24, 2026Reroof · 218 m away
- 9418 Hermosa DrSep 21, 2026Ptrap · 222 m away
- 9421 Hermosa DrFeb 16, 2026Gas line to generator · 224 m away
- 9409 Hermosa DrMar 18, 2026New construction hvac · 259 m away
- 9406 Hermosa DrJul 22, 2026Install electrical for new residence · 262 m away