548 Kirkwood Dr
Dallas, TX 75218
New home permitted after house demolition at 548 Kirkwood Dr
City of Dallas records show a house demolition permit filed July 7, 2026, followed by a residential new-construction permit filed July 16 for 548 Kirkwood Dr. Plumbing, electrical, fencing and mechanical permits were filed through October 15, 2026.
Summarized from City of Dallas records · updated Oct 15, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Oct 15, 2026
- since Jul 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 548 Kirkwood Dr
What is being built at 548 Kirkwood Dr in Dallas?
City permits indicate a new residence is planned after demolition of the existing house. The residential new-construction permit, RES-NEW-26-001267, was filed July 16, 2026.
Was the house at 548 Kirkwood Dr permitted for demolition?
Yes. The City of Dallas issued a residential demolition permit record, RES-DEM-26-000588, filed July 7, 2026, for complete house demolition.
When was new construction permitted at 548 Kirkwood Dr?
The residential new-construction permit, RES-NEW-26-001267, was filed July 16, 2026.
What other permits were filed for 548 Kirkwood Dr?
Records include new-construction plumbing filed August 17, 2026, new electrical filed August 25, and an 8-foot cedar fence filed October 5. A residential mechanical permit for a 3-ton gas Lennox system was filed October 15.
Is construction underway at 548 Kirkwood Dr?
The records show a residential new-construction permit filed July 16, 2026, and related plumbing, electrical and mechanical permit filings through October 15. They do not state the construction status.
What is the project cost for the new home at 548 Kirkwood Dr?
The records provided do not report a project cost or permit valuation.
Also being built nearby
All of 75218- 544 Kirkwood DrNov 3, 2025New construction plumbing · 10 m away
- 554 Kirkwood DrJul 25, 2025Install 8' cedar fence on steel post · 15 m away
- 545 Kirkwood DrDec 5, 2025Gas test · 16 m away
- 539 Blanning DrMay 27, 2025Replace 4 ton complete · 90 m away
- 529 Blanning DrMay 29, 2026Two bath, kitchen, laundry and tankless remodel addition · 104 m away
- 544 Parkhurst DrAug 7, 2026Remove and replace roof · 114 m away
- 508 Parkhurst DrJan 26, 2021New construction · 143 m away
- 512 Blanning DrJul 1, 2026Replacing a 3.5 ton gas complete system · 143 m away
- 618 Kirkwood DrNov 11, 2026Nsfaa a residential 485 sq ft addition and 125 sq ft remodel · 161 m away
- 602 Blanning DrAug 22, 20254 ton system · 167 m away
- 628 Kirkwood DrOct 14, 2025Remove and replace shingles · 175 m away
- 533 Hambrick RdSep 15, 2026Gas line replacement in backyard · 189 m away