569 Classen Dr
Dallas, TX 75218
Sewer line and cleanout work permitted at 569 Classen Dr
A City of Dallas residential plumbing permit filed Nov. 4, 2025, covers installing new 2-inch PVC/ABS piping on the building sewer system and adding a cleanout. A separate 2019 permit covered replacing the home's roof.
Summarized from City of Dallas records · updated Nov 4, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 4, 2025
- since Nov 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 569 Classen Dr
What work is being done at 569 Classen Dr?
A Nov. 4, 2025, City of Dallas permit covers new 2-inch PVC/ABS piping on the building sewer system and a cleanout for access. The record describes residential plumbing work.
Is a new home being built at 569 Classen Dr?
The records provided do not indicate new home construction. The latest permit, RES-PLM-25-006955, is for sewer piping and a cleanout.
When was the plumbing permit filed for 569 Classen Dr?
The City of Dallas filed permit RES-PLM-25-006955 on Nov. 4, 2025.
Was there also roof work at 569 Classen Dr?
Yes. A July 31, 2019, City of Dallas permit covered removing the existing roof and installing a new one.
How much is the work at 569 Classen Dr expected to cost?
The records do not provide a project cost or permit valuation for the sewer work. The 2019 roof permit lists a reported valuation of $82, which is not a total project cost.
Also being built nearby
All of 75218- 565 Classen DrNov 6, 2020Replace or modify existing hvac · 19 m away
- 577 Classen DrDec 29, 2025Replacing riser due to tree falling on the home · 26 m away
- 561 Classen DrAug 11, 2026Re roof onlyremove shingles and underlaymentinstall new underlayment and new shingles · 29 m away
- 559 Classen DrNov 16, 2020Remove existing roof and install new roof · 33 m away
- 551 Classen DrMay 30, 2025Install gas to outside grill in backyard and a kitchen sink · 51 m away
- 585 Classen DrAug 4, 2026Gas relay · 53 m away
- 539 Classen DrFeb 3, 202618 x 11 approach · 79 m away
- 560 Classen DrOct 16, 20263 ton base upflow gas system · 90 m away
- 554 Classen DrJul 23, 20263-ton a/c changeout rheem · 99 m away
- 565 Bondstone DrJul 9, 2026Installation of a complete 2 ton ac system to addition · 101 m away
- 550 Classen DrJan 11, 2021Upgrade existing electrical service · 107 m away
- 603 Classen DrNov 24, 2020Install electrical for new contruction or addition · 115 m away