575 Northlake Dr
Dallas, TX 75218
575 Northlake Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 575 Northlake Dr, Dallas, TX 75218. The most recent, filed January 25, 2021, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Jan 25, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 25, 2021
- since Jan 25, 2021
- Largest scope
- —
- Listed value
- $79
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 575 Northlake Dr
What is being built at 575 Northlake Dr?
The latest filing (City of Dallas permit 2101256003, January 25, 2021) covers remove existing roof and install new roof.
How many permits and filings does 575 Northlake Dr have?
1 filing across 1 project, from January 25, 2021 to January 25, 2021.
How much is the construction at 575 Northlake Dr worth?
Permits at this address list about $79 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 575 Northlake Dr?
Yes. Nearby filings include 561 Northlake Dr (gas to pool, Oct 22, 2026); 538 Northlake Dr (replacing a 4 ton gas complete system, Jul 31, 2026); 557 Northlake Dr (we would like to install the above ground pool, 18x33 with the deck around it, 32x33, Sep 24, 2026).
How do I get alerts for new permits at 575 Northlake Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 561 Northlake DrOct 22, 2026Gas to pool · 40 m away
- 538 Northlake DrJul 31, 2026Replacing a 4 ton gas complete system · 42 m away
- 557 Northlake DrSep 24, 2026We would like to install the above ground pool, 18x33 with the deck around it, 32x33 · 51 m away
- 534 Edgelake DrJul 8, 2026Hvac changeout: remove existing equipment and install new 5-ton · 80 m away
- 528 Edgelake DrFeb 10, 2026Mcr with battery installation of 7.25 kwp rooftop solar panel system with ess · 92 m away
- 560 Northlake DrSep 2, 2026Reset/reshim of 677sqft · 101 m away
- 620 Harter RdAug 7, 2026620 harter install 10 concrete pilings to stabilize foundation · 121 m away
- 531 Northlake DrOct 16, 2020Plumbing (pl) single family alteration · 123 m away
- 607 Harter RdMar 3, 2026The main system and the garage's upper floor system will be replaced, a new copper line will be installed, and the main system ducts will be replaced · 140 m away
- 643 Harter RdAug 5, 2026Repair leak on gas riser near exterior wall · 147 m away
- 576 N Buckner BlvdNov 17, 2026New driveway with approach in rear of property, approach to alley · 157 m away
- 649 Harter RdJun 23, 2025Replace 3ton base upflow gas system · 161 m away