Recent · latest filing Dec 2025Residential
7951 Enclave Way
Dallas, TX 75218
7951 Enclave Way HVAC system replacement permitted
A residential permit indicates replacement of a 3.5-ton complete gas system at 7951 Enclave Way. The City of Dallas permit was filed on December 31, 2025, under permit RES-MEC-25-004245.
Summarized from City of Dallas records · updated Dec 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 31, 2025
- since Dec 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7951 Enclave Way
What is happening at 7951 Enclave Way in Dallas?
A City of Dallas residential mechanical permit indicates a 3.5-ton complete gas system is being replaced. The permit was filed December 31, 2025.
Is new construction planned at 7951 Enclave Way?
The record provided is for replacing a residential mechanical system, not new construction.
What type of permit was filed for 7951 Enclave Way?
It was a Residential Mechanical Permit, number RES-MEC-25-004245.
When was the permit for 7951 Enclave Way filed?
The permit was filed on December 31, 2025.
How large is the replacement system at 7951 Enclave Way?
The permit description specifies a 3.5-ton complete gas system.
Also being built nearby
All of 75218- 7955 Enclave WayJun 26, 2025Replace 1- 3 ton gas complete hvac system in attic · 8 m away
- 7931 Enclave WayDec 5, 2020Install water heater · 41 m away
- 7923 Enclave WayNov 14, 2026Gas line test · 58 m away
- 1536 Waterside CtSep 24, 2026Installing 3 ton gas systiem · 67 m away
- 1540 Waterside CtJul 3, 2025Replacing 50 gallon gas water heater · 68 m away
- 1520 Waterside CtJan 28, 2026Hvac replacement · 70 m away
- 7945 Briar Brook CtOct 27, 2025Replace double check valve · 88 m away
- 7937 Briar Brook CtJul 25, 2025Re-roof, composition shingle, no decking · 90 m away
- 7932 Briar Brook CtJan 29, 2026Installing 6 total pilings (6 exterior) · 105 m away
- 7928 Briar Brook CtAug 20, 2026It is recommended at the home to install 10 remedial piers · 107 m away
- 1606 Highland RdNov 6, 2026Main service repairs convert overhead to underground · 117 m away
- 1523 Waterside CtDec 17, 2025Repair hot water slab leak by jackhammering through the utility room tile and concrete slab, excavating approximately 2½ feet to expose and repair the leaking ½-inch hot water line.1. shut off hot water supply. 2. protect surrounding work area. 3. jackhammer through tile and concrete slab in the utility room. 4. excavate approximately 2½ feet to reach the leaking pipe. 5. expose and repair or replace the ½-inch hot water line. 6. pressure test repair. 7. backfill excavation and restore slab and surface · 122 m away