8114 Forest Hills Blvd
Dallas, TX 75218
Residential 48 kW generator installation at 8114 Forest Hills Blvd
City of Dallas permits indicate a 48 kW generator with two 200-amp automatic transfer switches and natural gas connections was permitted on September 30, 2025. A separate permit dated January 5, 2026, covers running a gas line to the generator.
Summarized from City of Dallas records · updated Jan 5, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 5, 2026
- since Sep 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8114 Forest Hills Blvd
What is being installed at 8114 Forest Hills Blvd?
City of Dallas permit RES-ELC-25-003446 describes installing a 48 kW generator with two 200-amp automatic transfer switches and natural gas connections.
When was the generator permitted at 8114 Forest Hills Blvd?
The electrical permit was filed September 30, 2025.
Is the generator at 8114 Forest Hills Blvd connected to natural gas?
The September 30, 2025, permit describes natural gas connections. A separate plumbing permit filed January 5, 2026, covers running a gas line to the generator.
What size generator is planned for 8114 Forest Hills Blvd?
The permit describes a 48 kW generator.
What do the permits say about the generator's transfer switches?
The electrical permit describes two 200-amp automatic transfer switches.
Also being built nearby
All of 75218- 8123 Forest Hills BlvdAug 19, 2026Installing 7 total piers · 34 m away
- 1409 San Rafael DrSep 8, 2026Replacing a 4 ton gas complete system · 34 m away
- 1425 San Rafael DrMay 21, 2025Remove and replace city approach and city walk · 34 m away
- 8138 Forest Hills BlvdDec 16, 2025Replace (1) hvac system · 39 m away
- 1406 San Rafael DrMay 14, 2026Replacing 2.5 ton heatpump unit · 41 m away
- 8162 Santa Clara DrJun 25, 20253 ton system replacment · 169 m away
- 8178 Santa Clara DrSep 15, 2026Replace prv · 188 m away
- 8185 Santa Clara DrMar 25, 2026Tankless like for like swap tankless shut off valve · 188 m away
- 8130 San Fernando WayJan 13, 2026Installation of a new underground gas line for a new 26kw generator. gas line is approximately 50' and will be using minimum 1" gas line and 1" flex risers · 195 m away
- 8184 Santa Clara DrOct 7, 2026Remodel master bath 2 lavatories 1 toilet 1 shower · 198 m away
- 8114 San Fernando WayAug 14, 2026Scope of work – hvac installation* furnish and install two (2) new complete hvac systems, including outdoor condensing units, indoor equipment, and all required accessories.* furnish and install new above-ceiling supply and return ductwork in accordance with the approved plans and required airflow.* furnish and install new below-floor supply and return ductwork as required.* furnish and install all required supply diffusers, return air grilles, registers, dampers, flex duct, fittings, transitions, and accessories.* fabricate and install required supply and return plenums for both hvac systems.* properly support, hang, seal, and insulate all new ductwork in accordance with applicable mechanical codes and project requirements.* furnish and install required refrigerant line sets, condensate drain piping, and equipment connections for both systems.* connect new hvac equipment to existing utilities where applicable. electrical service and gas piping beyond the immediate equipment connections are excluded unless otherwise specified.* seal all duct joints and connections to minimize air leakage and ensure proper system performance.* perform complete system startup, refrigerant charging, airflow balancing, and operational testing.* verify proper operation of both hvac systems upon completion.* remove and properly dispose of hvac-related construction debris generated from this scope of work · 203 m away
- 8115 Santa Clara DrJul 11, 2025Wire swimming pool · 208 m away